BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2026 at 7:00 PM

Updated January 29, 2026

Site work and paving for a mixed-use development in Winter Haven, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project consists of the Thompson Nursery Road extension in Winter Haven, Florida. The limits of construction begin at SR 540 and US 17 and extend 1.9 miles to the southeast and ends south of Rifle Range Road (CR 655) and Eloise Loop Rd. The prime contractor or subcontractors shall be on the Current List of FDOT Prequalified Contractors in the following work classes: Drainage; Flexible Paving; Grading; Guardrail; Pavement Marking; Roadway Signing; Traffic Signal; Hot Plant-Mixed Bituminous Courses; Electrical Work; and Sidewalk. Construction time to complete this project is 1,033 calendar days Percentage of Work: The prime contractor shall perform a minimum of 40% of all work contained within the scope of work as outlined in the bid documents and special conditions. This percentage of work requirement does not include the furnishing of materials or equipment in the construction, if not installed by the primary contractor. Liquidated Damages will be assessed at the amount of $10,244.00 plus 0.005% of any amount over $40 million (round to the nearest whole dollar) per calendar day as authorized by Florida Statutes Section 337.18(2) shall be assessed. QUESTIONS: Questions regarding this bid should be in writing and should reference the above Bid. Submit all questions to Ken Brush, Procurement Contracts Manager, via email at kenbrush@polkcounty.net or via fax at (863) 534-6789 by 4:00 p.m. Monday, December 22, 2025. Question Deadline 01/21/2026 at 4:00 PM ET Direct all questions to the Department by posting them to the Department's website at the following URL address: https://bqa.fdot.gov/home

GC Bidding

Roads / Highways

$44,351,450.00

Public - County

Paving, Site Work

531

3

8

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
179
Bidding Soon
2,687
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

April 20, 2026

Project location map

Thompson Nursery Rd, Winter Haven, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.