BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Site work and paving for a mixed-use development in Manson, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Contractor shall do all work and furnish all tools, materials, and equipment for the improvement of the Totem Pole Road Improvements Phase I and includes temporary erosion and sediment control, clearing and grubbing, roadway excavation, embankment compaction, crushed surfacing, permanent stormwater system and outfall, stormwater treatment, retaining wall, concrete curb, gutter, and sidewalk, illumination, rectangular rapid flash beacons, property restoration and other work, all in accordance with the attached contract plans, these contract provisions, and the standard specifications, and addenda thereto. This Contract provides for the improvement of CRP 650 Totem Pole Road Improvements and includes temporary erosion and sediment control, clearing and grubbing, roadway excavation, embankment compaction, crushed surfacing, HMA, permanent stormwater system and outfall, stormwater treatment, retaining wall, concrete curb, gutter, and sidewalk, curb ramps, illumination, rectangular rapid flash beacons, property restoration, and other Work. Estimated range cost: 3,000,000 - 3,300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$3,200,000.00

Public - County

Paving, Site Work

102

20

35

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
27
Bidding Soon
182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2026

March 23, 2026

Project location map

To Be Determined, Manson, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.