Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 27, 2026 at 7:00 PM
Updated January 28, 2026
Site work and paving for a mixed-use development in Manson, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Contractor shall do all work and furnish all tools, materials, and equipment for the improvement of the Totem Pole Road Improvements Phase I and includes temporary erosion and sediment control, clearing and grubbing, roadway excavation, embankment compaction, crushed surfacing, permanent stormwater system and outfall, stormwater treatment, retaining wall, concrete curb, gutter, and sidewalk, illumination, rectangular rapid flash beacons, property restoration and other work, all in accordance with the attached contract plans, these contract provisions, and the standard specifications, and addenda thereto. This Contract provides for the improvement of CRP 650 Totem Pole Road Improvements and includes temporary erosion and sediment control, clearing and grubbing, roadway excavation, embankment compaction, crushed surfacing, HMA, permanent stormwater system and outfall, stormwater treatment, retaining wall, concrete curb, gutter, and sidewalk, curb ramps, illumination, rectangular rapid flash beacons, property restoration, and other Work. Estimated range cost: 3,000,000 - 3,300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Roads / Highways
$3,200,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2026
March 23, 2026
To Be Determined, Manson, WA
Related To This Project
Manson, WA
Bid Date: Jan 06 2026
Manson, WA
Bid Date: Feb 19 2026
Manson, WA
Bid Date: Feb 17 2026
Manson, WA
Bid Date: Dec 02 2025
Manson, WA
Bid Date: Dec 08 2025
Manson, WA
Bid Date: Sep 23 2025
Manson, WA
Bid Date: Sep 05 2025
Manson, WA
Bid Date: Jul 22 2025
Manson, WA
Bid Date: Jun 24 2025
Manson, WA
Bid Date: Mar 07 2025
Manson, WA
Bid Date: Aug 28 2024
Manson, WA
--
Manson, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
