Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 9, 2025 at 7:00 PM
Updated December 10, 2025
Site work for a water / sewer project in Wisc Dells, Wisconsin. Completed plans call for site work for a water / sewer project.
The Project Includes the Following Work: Construction, Test Pumping, Sampling and Laboratory Testing of Two Bedrock Test Wells. No Proposal Will Be Accepted Unless Accompanied by a Certified Check or Bid Bond Equal to at Least 5% of the Amount Bid, Payable to the Owner as a Guarantee That, if the Bid is Accepted, the Bidder Will Execute and File the Proper Contract and Bond Within 15 Days After the Award of the Contract. The Certified Check or Bid Bond Will Be Returned to the Bidder as Soon as the Contract is Signed, and if After 15 Days the Bidder Shall Fail to Do So, the Certified Check or Bid Bond Shall Be Forfeited to the Owner as Liquidated Damages. Owner Reserves the Right to Waive Any Informalities or to Reject Any or All Bids. Published by the Authority of the Village of Lake Delton. Question Deadline 12/15/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Andrew Rockweiler, PE, (608) 355-8877 | arockweiler@msa-ps.com . Questions received less than seven days prior to the date for opening of Bids may not be answered. This project consists of the construction, pumping and sampling of two (2) rock-walled potable water test wells for a future Well #8 in the Village of Lake Delton, Wisconsin. Pending the results of the two test wells, there is an option to construct a third rock-walled test well if needed; the third test well is included in the bid via supplemental bid items. The proposed sequence of work is as follows: 1. Test Well Construction at Site 2 - Clara a. Access site- no tree clearing or temporary access road construction anticipated b. Install erosion control Install surface casing, drill outer hole Set and grout inner casing, remove outer casing Drill out lower drillhole Perform well development Perform well televising Abandon the bottom 15 feet of the well Perform geophysical log and flow spinner test Set packer, test pump and discharge piping Perform test pump event #1 (no packer) Tentative - perform test pump event #2 (w packer) Provide pump testing results Provide laboratory analysis results Complete limited site restoration 2. Test Well Construction at Site 3 - CTH A Access site Construction of temporary access road and culvert Tree clearing Install erosion control Install surface casing, drill outer hole Set and grout inner casing, remove outer casing, if possible Drill out lower drillhole Perform well development Perform well televising Abandon the bottom 15 feet of the well Perform geophysical log and flow spinner test Set test pump and discharge piping Perform test pump Provide pump testing results Provide laboratory analysis results Complete limited site restoration If the Owner elects to proceed with the construction of a test well at Site 1 - Springbrook, the proposed sequence of work will be as follows: Access site Construction of temporary access road and culvert Tree clearing Install erosion control Install surface casing, drill outer hole Set and grout inner casing, remove outer casing Drill out lower drillhole Perform well development Perform well televising Abandon the bottom 15 feet of the well Perform geophysical log and flow spinner test Set test pump and discharge piping Perform test pump Provide pump testing results Provide laboratory analysis results Complete limited site restoration Substantial Completion : Base Bid: July 3, 2026 Final Completion : September 4, 2026.
GC Bidding
Water / Sewer
$100,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
14
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 22, 2025
March 30, 2026
Multiple Locations, Wisc Dells, WI
Related To This Project
Wisc Dells, WI
Bid Date: Jan 06 2021
Wisc Dells, WI
Bid Date: Aug 08 2025
Wisc Dells, WI
Bid Date: Jul 01 2025
Wisc Dells, WI
Bid Date: Jun 23 2025
Wisc Dells, WI
Bid Date: May 27 2025
Wisc Dells, WI
Bid Date: May 06 2025
Wisc Dells, WI
Bid Date: Mar 20 2025
Wisc Dells, WI
--
Wisc Dells, WI
Bid Date: Dec 09 2024
Wisc Dells, WI
Bid Date: Oct 09 2024
Wisc Dells, WI
--
Wisc Dells, WI
Bid Date: Jul 03 2024
Wisc Dells, WI
Bid Date: Jul 18 2019
Wisc Dells, WI
Bid Date: Jan 13 2022
Wisc Dells, WI
Bid Date: Jan 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
