Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 12, 2026

Site work for a water / sewer project in Burien, Washington. Completed plans call for site work for a water / sewer project.

The Project Consists of Telem-Etry Sites Upgrades at Supply Station 139 and the 500,000-Gal Lon Reservar Site Including the Fol Lowing Work Replace Telemetry Panel, Radio, Instrumentation, Enclosure, and Appartenances at Supply Station 139. Flow Data Will Be Received From Spu Flow Meters and Inputs From Existing or Additional Pres Sure Transducers Will Be Includ Ed. Replace Telemetry Panel, Radio, Enclosure, and Appurte Nances at the District's 600,000 Gallon Reservoir Pump Station Site Including Panel Radio and Active Inputs and Outpute Incorporate District-Furnished Radio Equipment Into Each Telem Etry Panel The Work Will Occur at Tw Sites: Supply Station 139 at the Intersection of 10th Avenue Sw and Sw 149th Street 500,000-Gallan Reservuir. At the Corner of 4th Avenue Sw and Sw 158th Street The Sites Are Located in Section 19. Township 23 North, Range East. W. M. King County, Washington in the City of Burien Location of the Work Is Shuwa on the Construction Plans. Prospective Bidders Must Have Oxtensive Experience in Telem Etry Installation and Program-Ming Projects. The Bidder Shall Have Completed at Least Three (3) Electrical AR Telemetry Projects for Public Agencies Within the Past Five Years. Completed Projects Shall Be Projects With Construc Tion Cost of at Least $150,000 or More Each. Such Experience Shall Bo Documented as Directed on the Proposal Form in the Project Manual The Bid Must Be Submitted on the Original Proposal Forn Provid Ed in the Project Manual and Shall Be Accompanied by a Mandatory Bidder Responsibility Checklist, Bid Proposed Deposit in the Form of a Surety Bond, Postal Money Order, Cashier's Check, or Certified Check Made Payable to the King County Water District No. 49 for a Sum Of Not Lose Than 5 Poruent of the Total Bid. The Engineer's Estimate of Con Struction Cost Is $408,100 The District Reserves the Right to Reject Any and All Buds, to Waive Any Informality in Badding, and to Make the Award as Deemed to Be in the Best Interest of the District Proposals Received After the Time Announced for the Bid Open-Ing Will Not Be Considered. No Lad Der May Withdraw Its Bid After the Time Announced for the Ind Opening or Before the Award and Execution of the Contract Unlese the Award Is Dolayed for a Peri Od Exceeding Sixty (60) Calendar Days. Notice to Proceed With Con Struction of This Project Will Not He Issued Until Such Time That All Necessary Permits Are Issued and Received by the District. The Work Must Be Completed Within Two Hundred Seventy (270) Calendar Days From the Notice to Proceed. The Bidder Shall Direct Any Questions to Mr. Jorgan Peadon, General Manager of the District, at (206) 242-8535 King County Water District No. 49 Tom Jovanovich, Secretary

GC Bidding

Water / Sewer

$500,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
116
Bidding Soon
2,061
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2026

November 23, 2026

Project location map

Multiple Locations, Burien, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed