BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 11, 2025 at 7:00 PM

Updated December 12, 2025

Site work for a water / sewer project in Missoula, Montana. Completed plans call for site work for a one-story above grade water / sewer project.

This project consists of installing approximately 872 linear feet of 4-inch HDPE DIPS DR11 water main in the alley between Cherry Street and Poplar Street from Van Buren Street to past Taylor Street. Work includes making connections to existing water mains, swapping and connecting existing water services to the new mains, and installing associated appurtenances, fittings, and items as indicated on the construction plans. Restoration of all disturbed areas including asphalt, concrete, gravel, landscaping, irrigation, and other miscellaneous work is required. All work must follow the detailed construction plans provided. Bidders must consider the full scope as described and ensure all necessary work and restoration is included in their bids. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Question Deadline Dec 03, 2025 • Engineers estimate $500k - $600k

Bid Results

Water / Sewer

$494,154.00

Public - City

Site Work

14

10

5

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
7
Bidding Soon
92
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2025

August 6, 2026

Project location map

Cherry ST, Missoula, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.