Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 5, 2025 at 7:00 PM
Updated December 6, 2025
Demolition and site work for a power facility in Lehigh Acres, Florida. Completed plans call for site work for a power facility.
Oil Well Substation Grade and Fill. There are no additional details under Scope of Work, and there are no instructions to bidders provided in the available content. LCEC is soliciting proposals from qualified construction contractors to provide Grade and Fill services to develop an undeveloped parcel of land to facilitate LCEC's below grade construction of the A and B Bus at Oil Well Substation. This RFP outlines the project requirements, submission procedures, and evaluation criteria. Bidders must include in their submission all proposed subcontractors for approval by LCEC. Any subcontractors not included at the time of proposal submission will not be permitted to begin work under this project until the Contractor has received express consent from LCEC. Questions Due 12/12/2025 Point of Contact: Emmett Orfan, Email: Emmett.Orfan@LCEC.net Cooperative will begin below grade construction of A & B bus at our new Substation at Oil Well. Substation is to be located at Oil Well Road, Naples, Florida 34120 (Address not yet assigned). The primary scope of work involves developing an undeveloped parcel including but not limited to: o Initial Civil & Site pre: Demo (if necessary), Site Prep (Cleaning & Shrub removal), bulk fill & Grade up to 2 ft below final surface grade, and dry detention o Fill and grade up to final surface grade. o Demobilization after partial fill and grade, followed by remobilization for final fill surface grade shall be required. The contractor shall provide all labor, supervision, construction equipment, tools, and materials necessary to complete the work detailed in this bid package in accordance with the attached drawings, and specifications. A pre-construction meeting may be necessary with prevailing jurisdictions, municipalities, and water management authorities prior to commencement. Once a commencement date is established, it is imperative that work begins within the mandatory time frame. Anticipated construction commencement date is 1/12/26. Site work is to start within 15 days of city approved construction commencement date. Commencement date may change due to permitting approvals. Actual commencement date to be established once a bidder is selected. Prior to the submission of proposal the Contractor shall make and shall be deemed to have made a careful examination of the site of the Work and of the Contract Documents, and shall become informed as to the location and nature of the proposed Work, transportation facilities, the type and character of soil and terrain to be encountered, the type of facilities required before and during the Work, general local conditions, vehicle and equipment accessibility, and all other matters that may affect the cost and the time of completion of the Work. The failure or omission of Contractor to examine any form, instrument, or documents shall in no way relieve any Bidder from any obligation. LCEC reserves the right to reject any or all proposals, negotiate with selected firms, and award based on the best value to the organization. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."
GC Bidding
Power Plant
$920,800.00
Public - County
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 5, 2026
January 12, 2026
Oil Well Rd, Lehigh Acres, FL
Related To This Project
Lehigh Acres, FL
Bid Date: Dec 23 2025
Lehigh Acres, FL
Bid Date: Dec 18 2025
Lehigh Acres, FL
Bid Date: Oct 08 2025
Lehigh Acres, FL
Bid Date: Dec 04 2025
Lehigh Acres, FL
Bid Date: Jun 02 2020
Lehigh Acres, FL
Bid Date: Aug 22 2025
Lehigh Acres, FL
--
Lehigh Acres, FL
Bid Date: Jun 24 2025
Lehigh Acres, FL
Bid Date: Jun 24 2025
Lehigh Acres, FL
Bid Date: Nov 13 2025
Lehigh Acres, FL
Bid Date: Jun 06 2025
Lehigh Acres, FL
Bid Date: Jun 24 2025
Lehigh Acres, FL
Bid Date: May 09 2025
Lehigh Acres, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
