Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Renovation of an educational facility in Lehigh Acres, Florida. Completed plans call for the renovation of a educational facility.
Electronic Qualification Statements to provide Building Official Services for Mirror Lakes Elementary School - HVAC Renovation, (Scope of Work defined page 20), will be received at the School Board of Lee County (hereinafter the District), Procurement Services Department, Bonfire Platform. All interested parties must register with Bonfire to view and download documents. It is the Respondent's responsibility to assure that the response is submitted to the Department of Procurement Services, Bonfire Platform prior to the opening date and time specified. The Bonfire electronic platform will not allow submissions after the opening date and time, and by subsequent will not be considered for award. Question Deadline 02/04/2026 at 2:00 PM ET Any questions concerning the Request for Qualifications shall be directed in writing via email to the Procurement Services Department, Lauri Adams, Procurement Agent LauriA@leeschools.net The target total project cost is between $8 Million and $12 Million which includes design, construction, labor, materials, etc. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Provide all Building Official Services for HVAC Renovation at Mirror Lakes Elementary School. Project to include: o Replace all AHUs with dual-path units; full warranty included. o Replace all existing exhaust fans with energy-efficient BAS-compatible models. o Install new VAV boxes to support the new AHUs. o Replace reprogram controls for updated HVAC configuration. o Replace all chilled water piping (Aquatherm(R) or equivalent). o Clean, flush, and chemically treat the entire chilled water loop. o Replace internally insulated ductwork. o Clean and re-wrap externally insulated ductwork. o Replace rusted or damaged diffusers. o Install Bi-Polar Ionization IAQ technology. o Replace existing chillers and pumps with (3) Trane(R) chillers; provide 10-year parts, labor, and refrigerant warranty.
Sub-Bidding
Educational
$12,000,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2026
April 20, 2026
525 Charwood Ave S, Lehigh Acres, FL
Related To This Project
Lehigh Acres, FL
Bid Date: Feb 18 2026
Lehigh Acres, FL
Bid Date: Feb 18 2026
Lehigh Acres, FL
Bid Date: Feb 13 2026
Lehigh Acres, FL
Bid Date: Jan 06 2026
Lehigh Acres, FL
Bid Date: Jan 05 2026
Lehigh Acres, FL
Bid Date: Dec 23 2025
Lehigh Acres, FL
Bid Date: Jan 22 2026
Lehigh Acres, FL
Bid Date: Oct 08 2025
Lehigh Acres, FL
Bid Date: Dec 04 2025
Lehigh Acres, FL
Bid Date: Jun 02 2020
Lehigh Acres, FL
Bid Date: Aug 22 2025
Lehigh Acres, FL
--
Lehigh Acres, FL
Bid Date: Jun 24 2025
Lehigh Acres, FL
Bid Date: Jun 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
