BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Renovation of an educational facility in Lehigh Acres, Florida. Completed plans call for the renovation of a educational facility.

Electronic Qualification Statements to provide Building Official Services for Mirror Lakes Elementary School - HVAC Renovation, (Scope of Work defined page 20), will be received at the School Board of Lee County (hereinafter the District), Procurement Services Department, Bonfire Platform. All interested parties must register with Bonfire to view and download documents. It is the Respondent's responsibility to assure that the response is submitted to the Department of Procurement Services, Bonfire Platform prior to the opening date and time specified. The Bonfire electronic platform will not allow submissions after the opening date and time, and by subsequent will not be considered for award. Question Deadline 02/04/2026 at 2:00 PM ET Any questions concerning the Request for Qualifications shall be directed in writing via email to the Procurement Services Department, Lauri Adams, Procurement Agent LauriA@leeschools.net The target total project cost is between $8 Million and $12 Million which includes design, construction, labor, materials, etc. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Provide all Building Official Services for HVAC Renovation at Mirror Lakes Elementary School. Project to include: o Replace all AHUs with dual-path units; full warranty included. o Replace all existing exhaust fans with energy-efficient BAS-compatible models. o Install new VAV boxes to support the new AHUs. o Replace reprogram controls for updated HVAC configuration. o Replace all chilled water piping (Aquatherm(R) or equivalent). o Clean, flush, and chemically treat the entire chilled water loop. o Replace internally insulated ductwork. o Clean and re-wrap externally insulated ductwork. o Replace rusted or damaged diffusers. o Install Bi-Polar Ionization IAQ technology. o Replace existing chillers and pumps with (3) Trane(R) chillers; provide 10-year parts, labor, and refrigerant warranty.

Sub-Bidding

Educational

$12,000,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
84
Bidding Soon
1,112
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

April 20, 2026

Project location map

525 Charwood Ave S, Lehigh Acres, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.