BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2025 at 7:00 PM

Updated December 20, 2025

Site work, paving and new construction of a municipal facility in New Hampton, Iowa. Completed plans call for the construction of a one-story above grade municipal facility.

The work shall be accomplished under a Single Construction Contract and will include general construction; site construction such as grading, paving, and site utilities; mechanical construction including plumbing, heating, ventilating, and air conditioning; and electrical construction including power, lighting, communication, and fire safety. On-site mobilization and construction shall begin no sooner than Monday April 6th, 2026, with substantial completion required by Friday, December 18th, 2026, dependent upon material delivery lead times. All bids must be made on the printed forms attached to and made a part of the proposed Contract Documents, and must be accompanied by bid security of at least five percent of the project bid amount in the form of cash, cashiers check, certified check, certified share draft, or bid bond. No bidder may withdraw their bid for at least forty-five days after the scheduled closing time for receipt of bids. The Chickasaw County Board of Supervisors reserves the right to reject any or all bids and waive all informality and irregularity if judged to be in their best interests, and to make a selection, including any alternate bids, that they judge best suited for the project's purpose. Submit inquires pertaining to the bidding documents to Jared Beenken, at Atura Architecture, 912 N 13 th Street, Clear Lake, IA 641-357-1923 (voice), jaredb@aturaarchitecture.com (e-mail).

Bid Results

Municipal

$577,220.00

Public - County

New Construction, Paving, Site Work

36

15

19

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
89
Bidding Soon
719
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

April 6, 2026

Project location map

1990 Mission Ave, New Hampton, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.