BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2026 at 7:00 PM

Updated January 28, 2026

Site work and new construction of a civil project in Altoona, Iowa. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Listing of Packages: Potential sub-bidders are providing SOQ’s to prequalify for one or more of the following Scope Packages that are part of this advertisement: Scope Package No. 05-1 – Structural Steel Supply: Generally, includes supply of structural steel such as columns, beams, joist, and decking. Scope Package No. 08-1 – Aluminum Framed Openings and Glazing Work: Generally, includes supply and installation of aluminum curtain walls, aluminum framed storefronts, and glazing. Scope Package No. 08-2 – Translucent Panel Assemblies Work: Generally, includes supply and installation of translucent panel assemblies. Scope Package No. 22-1 – Plumbing & HVAC Work: Generally, includes supply and installation of plumbing and HVAC systems such as domestic water, sanitary sewer, roof drainage, heating, cooling, ventilation, and dehumidification Question Deadline January 20, 2026 at 5:00 PM CT Requests for Clarifications and Questions: Please submit all questions directly to Story Construction Co. at estimating@storycon.com or keith.searcy@storycon.com. Story Construction Co. or the Owner retains the right to reject any/all submissions if documentation is flawed, incomplete, or insufficient to properly evaluate. Submissions must be fully completed on the correct form and include all supporting documentation to be considered responsive. Bidding Timeframe: Drawings and specifications to be released around January 26, 2026, with bids being due around February 26, 2026. Construction Timeframe: Earthwork starting March 2026; earth fill settlement period May 2026 through July 2026; concrete foundations starting after settlement period; building enclosure by May 2027; potable water to the distribution system December 2027.

Post-Bid

Water / Sewer

$200,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2026

March 2, 2026

Project location map

5739 NE 80th St, Altoona, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.