BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated February 5, 2026

Site work and new construction of an educational facility in Medina, Ohio. Completed plans call for the construction of a one-story above grade educational facility.

Sealed bids are requested for the MCCC New Ken Cleveland Construction Trades Academy Building 2 project. Bids must align with the provided contract documents. All bids are to be accompanied by a bid guaranty in the form of a Bid Guaranty & Contract Bond for the full amount of the bid (including all add alternates) or a certified check, cashier's check, or an irrevocable letter of credit for 10% of the bid amount (including all add alternates), as described in the Instructions to Bidders. No bidder may withdraw its bid within 60 days after opening. The owner reserves the right to waive irregularities in bids, reject any or all bids, and to conduct investigations to determine bidder responsibility. Question Deadline 01/02/2026 Submit all questions to Ron Cocco (rcocco@cplteam.com or T: 440-759-4030). The abbreviated summary the Work consists of the following: (refer to drawings for additional information) 1. Interior Alterations - Main School Bldg. - Second Floor Areas 2. Plumbing, Fire Protection, HVAC and Electrical work 1.05 Type of Contract: Project will be constructed under a single prime contract. 1.06 Use of Premises: A. Contractor shall have limited use of premises for construction operations. B. Use of Site: Limit use of premises to work in areas indicated. Confine operations at the site to the areas permitted under the Contract. Do not disturb portions of project site beyond areas in which the work is indicated without prior written approval of Owner. 1. Owner Occupancy: Allow for Owner occupancy of buildings and use of the adjacent interior and exterior areas. 2. Driveways and Entrances: Keep main driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees andemergency vehicles at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of driveways and entrances. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. c. When school is in session, no deliveries will be permitted between the following hours: 7:45 AM - 8:15 AM 11:00 AM - 12:00 PM 1:30 PM - 2:30 PM 3. Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials and location of any storage trailers to the parking areas north of the work site. 4. Owner will allow storage of materials in their building to facilitate project schedule. 5. The existing parking lot southwest of the construction area will be vacated by the School and made available to the Contractor for parking, staging and other uses

Award

Educational

$4,229,750.00

Public - County

New Construction, Site Work

94

25

49

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
9
Bidding Soon
1,275
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2026

January 20, 2026

Project location map

1101 W Liberty St, Medina, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.