BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 26, 2026 at 7:00 PM

Updated January 27, 2026

Renovation of a mixed-use development in Midland, Michigan. Completed plans call for the renovation of a educational facility; and theater / auditorium.

As of January 26, 2026, Project has been awarded to Metro Elevator for $290,209.54 The scope of work must include but is not limited to the removal and replacement of single bottom hydraulic cylinder on two elevators located at Midland High School and Central Auditorium. All work must be completed to meet State of Michigan Code A 17.1.4.3.3.

Award

Educational

$290,209.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
177
Bidding Soon
1,377
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 29, 2025

May 25, 2026

Project location map

600 E Carpenter St, Midland, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.