BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2025 at 7:00 PM

Updated December 12, 2025

Site work for a water / sewer project in Franklin, Wisconsin. Completed plans call for site work for a water / sewer project.

The project consists of the installation of a new metropolitan interceptor sewer (MIS) from the end of the existing MIS at W. Oakwood Rd. south to the Racine county line by microtunneling. The contractor will construct: Approximately 5,242 feet of 24-inch sewer to be installed within a casing pipe installed by microtunneling Approximately 20 feet of 24-inch sewer will be installed by an alternate trenchless method as specified in Section 02960,Tunnel Excavation and as shown on the plans 7 MMSD concrete manholes 8 microtunneling shafts 1 City of Oak Creek outside drop manhole 1 City of Franklin outside drop manhole 1 flow monitoring device at proposed manhole 40519 For further information or questions regarding these requirements, please contact the District procurement office, José Galván, at (414) 225-2169 or jgalvan@mmsd.com. 20% of the total contract price (13% MBE, 2% WBE, 5% SBE/VBE) 45% of total contract hours shall be performed by workers within the Sanitary Sewer Service Area Boundary 20% of total contract hours shall be performed by workers within the Target Area Employment Requirements Apprenticeship Utilization Requirement At least 15% of the total labor hours shall be performed by Apprentice(s) February 2026 Award Date (estimated) The contractor will construct: Approximately 5,242 feet of 24-inch sewer to be installed within a casing pipe installed by microtunneling Approximately 20 feet of 24-inch sewer will be installed by an alternate trenchless method as specified in Section 02960, TUNNEL EXCAVATION and as shown on the plans 7 MMSD concrete manholes 8 microtunneling shafts 1 City of Oak Creek outside drop manhole 1 City of Franklin outside drop manhole 1 flow monitoring device at proposed manhole 40519 Construction of the MIS extension will be concurrent with a City of Oak Creek development and potentially a City of Franklin development. The Oak Creek development is located at the southeast corner of the intersection of W. Elm Rd and S. 27th St., and the Franklin development is located at the intersection of W. South County Line Rd. and S. 27 th St. Question Deadline 01/01/2026 All questions related to this proposed contract, pre-bid presentation, or interested bidders list must be directed in writing to Nathan Churchill, nchurchill@mmsd.com, no later than 7 days before the bid opening date. Questions received after this deadline or directed to other contacts at the District will not be recognized.

GC Bidding

Water / Sewer

$20,000,000.00

Public - County

Site Work

3

26

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
180
Bidding Soon
2,947
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

March 2, 2026

Project location map

Multiple Locations, Franklin, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.