BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2025 at 7:00 PM

Updated December 19, 2025

Site work and paving for a civil project in North Waltham, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Utility Rehabilitation and Roadway Reconstruction within 200 Trapelo Rd. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 12/12/2025 at 12:00 PM ET Last Day for Written Questions, To cphilpott@city.waltham.ma.us The project involves the following major items: 1. Installation of approximately 3,700 linear feet of new zinc coated, CLDI water main ranging from 6" to 12" in diameter and all associated fittings, hydrants, valves, and all other related appurtenances. 2. Installation of approximately 2,500 linear feet of new SDR-35, PVC sewer main ranging from 6" to 8" in diameter and approximately 16 sewer manholes. 3. Installation of approximately 4,000 linear feet of new, concrete encased, electrical duct bank with associated fittings, structures, and other appurtenances. Work does not include connecting or installing electrical lines which will be done by others at a later date. 4. Installation of approximately 2 new utility poles which will be privately owned by the City of Waltham. 5. Reconstruction of approximately 1,000 linear feet of existing roadway including new granite curbing, asphalt sidewalks, and concrete wheelchair ramps. 6. Installation of approximately 4 new underground infiltration systems with associated catch basins, drain manholes, infiltration systems, drain pipe, and connections to existing drainage infrastructure. 7. Demolishing and disposing of an approximately 17,000 square foot, single-story brick/masonry building with basement and dirt floor crawl space constructed circa 1960. This shall include all associated and proper environmental abetment. Pre-Demolition Asbestos & Hazardous Building Materials Survey Report to be provided in bid documents. 8. Miscellaneous removal & disposal of existing asphalt pavement, loam & seeding, and site restoration.

Bid Results

Roads / Highways

$5,343,808.00

Public - City

Paving, Site Work

44

14

73

3

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
790
Active Projects
430
Bidding Soon
4,008
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2025

February 16, 2026

Project location map

200 Trapelo Rd, North Waltham, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.