BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2025 at 7:00 PM

Updated December 17, 2025

Site work and paving for a road / highway in Brooksville, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Question Deadline 12/23/2025 at 5:00 PM ET Questions must be submitted via: BidNetDirect, OpenBids, or procurement@cityofbrooksville.us Furnish all labor, materials, equipment, permits, MOT, and incidentals to mill and overlay with two (2) inches of asphalt, replace striping/stop bars to existing patterns, and coordinate access with residents and businesses. Streets include (PRIORITY streets notated) (estimated ft): ***W Ft Dade Ave -- Main St to Gary St (~1,460 ft; failing sections to storm ditch) PRIORITY ***Asmara St -- Jefferson to Union St (~350 ft) PRIORITY ***Hernando St -- full length (~480 ft) PRIORITY W Kelly St -- Keeling St to dead end (~280 ft) Tangerine St -- N. Lemon Ave to dead end (~436 ft) Bailey Ave -- Lamar Ave to Daniel Ave (~492 ft) E Early St -- S. Brooksville Ave to Main St (~810 ft) Oakland St -- Ft Dade Ave to Irene St (~515 ft) Beale St -- Zoller St to Pryor St (~436 ft) Mae View Cir (~137 ft), Wood Dr (~522 ft), Kings Cir (~215 ft) S Mildred Ave -- Daniel Ave to Lamar Ave (~530 ft) Contractor is responsible for field verification of all lengths/widths and materials; provide advance notices and maintain access. Construction time: 120 days from NTP. Mandatory Street Review: Bidder shall visit all listed streets before bidding to verify lengths/widths, tie-ins, drainage/utility needs, and propose treatment. Failure to visit does not relieve performance. -Street-by-Street Bid Schedule (REQUIRED): Provide a separate, total cost per street (itemized list) with unit-price backup (milling depth & SY, asphalt TN, MOT, striping/markings, utility adjustments, driveway/shoulder tie-ins). Indicate Overlay or Mill & Overlay and milling depth (in.) for each street. -Basis of Award / Budget: City may award in total or any combination of streets, and may add/delete streets/quantities to match funding, using the Street-by-Street schedule. -Brick Pavement Encountered: If brick is found, STOP WORK immediately, and notify the City for direction per applicable ordinance before proceeding.

GC Bidding

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
143
Bidding Soon
2,329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2026

February 5, 2026

Project location map

Multiple Locations, Brooksville, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.