Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 9, 2025 at 7:00 PM
Updated December 10, 2025
Site work and new construction of an educational facility in Geary, Oklahoma. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
Specifications: 1. 05720 Stainless Steel Railing: This railing shall be provided for interior ramps in rooms 105 (NW corner), 159, & 202, both sides as well as at stairs in 132C, both sides. All other railing for stairs, ramps, etc. interior and exterior shall be painted steel as indicated on drawings. 2. 10150.3 Marker Boards: Boards shall be provided by contractor, include in bid as specified complete with accessories outlined in spec. One per classroom, spec ed, art, computer lab, library, & music rooms (Qty: 23) Boards shall all receive tak strip/ cork material along with map rail, full width. 3. 10150.4 Tack Board: Omit all labor and materials related to tack boards. 4.10426 Signage: Interior room signs shall be as specified but at a size of 9" wide x 6.5" tall. The note previously provided stating "verify size with text requirements" is in reference to the highlite squares, not the sign itself. Site Work: 1. Side Walk/Paving: Concrete walk indicated along the west and north side of the building, including the large northwest corner space are existing, protect. See plan 'AD3-DWG1' attached to this addendum for indication of existing sidewalks to remain, new sidewalks/steps, new paving, gravel by others. New concrete walk shown to abut existing shall match existing sidewalk elevations, field verify. Only the dumpster location will require partial removal and replacement of the concrete walk for new 5" paving to match street side elevations. Gravel by owner's forces. Legend provided on plan. 2. Grading Plan 'C2': Two new contour designations near the northwest corner of the gymnasium (door #162) are incorrect. The contours starting at the existing elevation '1556' going east should be '1555' and '1554'. Contours continuing from there are correct 3. Building Pad: The excavation of existing soils, fill, compaction required for the building pad up to within 12" below finished floor shall be provided by owner's forces. Contractor shall be responsible for minimal 'leveling' of the pad and all work required after the pad is completed including digging footings, compacted subbase, etc. Contractor shall be required to coordinate with owner's forces to verify pad elevation and other site conditions during this phase of work. Finish Grading/ Sod: Contractor shall be responsible for all 'finish' fill, leveling, grading around the building along with sod work, typical. Architectural: 1. Railing: All railing shall be painted steel as indicted on plans except at interior ramps where they shall be stainless as specified, see Specifications section, note #1 this addendum. 2. Marker Boards: Contractor shall provide blocking in stud framed walls for all marker boards, full width (Qty: 19). The other 4 boards will be mounted to cmu walls. 3. Ramp in Lobby 105 is shown correctly on plan A6. The ramp shall receive a 48" height cmu partition with 2" cap block (paint). This ramp receives a hand rail, wall mounted, each side as specified (see 'spec' section note #1 this addendum) Disregard steel railing indicated on section 3/A31. Cmu partition shall be anchored to floor slab and cmu wall. 4. Railing indicated on sections 2/A30 and 1/A32 shall be fabricated as shown on 285/A45 Structural: 1. Sheet S2.2.2, plan #2 of the existing PEMB building shows new 6" zee purlins to stiffen existing roof structure. In lieu of using (2)1/2" bolts at 36" o.c. contractor may use self tapping screws at 12" o.c., top and bottom, staggered. Screws shall be 1/4"x14x1-1/4 DP3. Contractor shall be responsible for means and method of access to the area for this work whether from the interior, exterior, or both. Electrical: 1. Clock System: There is no clock system to be provided in bid. This item may be added post bid by owner to be coordinated on site at a later date. 2.CCTV System: There is no CCTV system to be provided in bid. This item may be added post bid by owner to be coordinated on site at a later date. 3.Access Control: There is no access control to be provided in bid. This item may be added post bid by owner to be coordinated on site at a later date.
Post-Bid
Educational
$5,000,000.00
Public - City
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2025
February 9, 2026
To Be Determined, Geary, OK
Related To This Project
Geary, OK
Bid Date: Nov 21 2023
Geary, OK
Bid Date: Apr 20 2023
Geary, OK
Bid Date: May 05 2022
Chickasha, OK
Bid Date: Dec 10 2025
Miami, OK
Bid Date: Jan 06 2026
Tulsa, OK
Bid Date: Jan 09 2026
Ardmore, OK
Bid Date: Dec 17 2025
Paoli, OK
Bid Date: Dec 08 2025
Oklahoma City, OK
Bid Date: Dec 23 2025
Ada, OK
Bid Date: Jan 05 2026
Piedmont, OK
--
Oklahoma City, OK
Bid Date: Dec 29 2025
Tahlequah, OK
Bid Date: Jan 15 2026
Talihina, OK
Bid Date: Dec 18 2025
Chickasha, OK
Bid Date: Jan 06 2026
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.