BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2026 at 7:00 PM

Updated February 18, 2026

Renovation of a water / sewer project in Fernandina Beach, Florida. Completed plans call for the renovation of a one-story above grade water / sewer project.

Question Deadline 12/26/2025 It is the Bidders responsibility to check the Citys website for Addenda prior to submitting their bid. The deadline for questions is ten days before bid opening. Specification questions during the submittal period must be submitted in writing to Wanda Weaks, Purchasing Specialist, at wweaks@fbfl.org The Fernandina Harbor Marina is a full-service marina located in the historic waterfront district of Fernandina Beach on Amelia Island, Florida, right at the northern end of the Florida Intracoastal Waterway (ICW Mile Marker 716). The address of the Marina is 3 South Front St. The Fernandina Harbor Marina is replacing key structural dock components located on two main docks within the Marina footprint. The Contractor will provide all tools, materials, labor, supervision, and equipment for the project including, but not limited to, mobilization/demobilization, project set-up, safety equipment installation, permitting, waste material disposal, and clean-up. The Contractor is responsible for all measurements for the rehabilitation of the dock(s). The City of Fernandina Beach, Florida is accepting competitive sealed bids for rehabilitation of Marina Docks G and B at the City of Fernandina Beach Marina, located at 3 South Front Street in Fernandina Beach, Florida. All submittals must be uploaded to the DemandStar E-bidding System prior to the stated deadline. Submittals will not be considered from any firm that is not represented at the mandatory pre-bid meeting. Any bidder who arrives after the meeting has concluded will not be considered. Vendors should submit responses through the DemandStar website. The City asks that all vendors register with DemandStar for notification of open bids, RFPs, and RFQs. Vendors who obtain documents from a source other than DemandStar are cautioned that the information may be incomplete. Dock G – South end (approx. 245’ long, consisting of 7’ x12’ sections; Bellingham Docks & concrete piles) 1. Replace all dock pile guides to accommodate the existing 18” pilings 2. Replace all whaler boards with marine grade equivalent 3. Replace all rubber rub-rail with marine grade equivalent 4. Replace all section thru-rods with marine grade equivalent 5. Replace cleat bolt hardware with marine grade galvanized steel hardware 6. Repair floatation issues at the southernmost section(s) 7. Replace all utility strapping for existing water & power supply lines with marine grade strapping 8. All labor work shall come with a 1-year labor warranty. 9. Costs shall include permitting, mobilization, project set-up, safety equipment, waste disposal, and clean-up. Dock G - Landing & North End (approx. 110’ long, consisting of a 23’ x 12’ landing, 6’ x 8’ sections of American Docks and concrete piles.) 1. Replace all dock pile guides to accommodate the existing 18” pilings 2. Replace all whaler boards with marine grade equivalent 3. Replace all rubber rub-rail with marine grade equivalent 4. Replace all section thru-rods with marine grade equivalent 5. Replace cleat bolt hardware with marine grade galvanized steel hardware 6. Replace all utility strapping for existing water & power supply lines with marine grade strapping Bid Additive - Rehabilitation of Dock B Dock B is approximately 205’ long and is located at the northern area of Fernandina Harbor Marina. All work will consist of the following work and specifications: 1. Fabricate and replace all pile guides to accommodate existing 18” concrete piles 2. Replace all whaler boards with marine grade equivalent 3. Replace all rubber rub-rail with marine grade equivalent 4. Replace all section thru-rods with marine grade equivalent 5. Replace cleat bolt hardware with marine grade galvanized steel hardware 6. Replace all utility strapping for existing water & power supply lines with marine grade strapping 7. Replace all existing fire extinguisher cabinets with marine grade equivalent 8. All labor work shall come with a 1-year warranty. 9. Costs shall include permitting, mobilization, project set-up, safety equipment, waste disposal, and clean-up

Award

Water / Sewer

$282,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
3
Bidding Soon
529
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

March 9, 2026

Project location map

3 S Front St, Fernandina Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.