BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2026 at 7:00 PM

Updated February 4, 2026

Site work for a water / sewer project in Adrian, Michigan. Completed plans call for site work for a one-story above grade water / sewer project.

Adrian, Michigan 500,000 Gallon Double Ellipse Exterior Overcoat Wet Interior Repaint And Miscellaneous Repairs The project involves work on a 500,000 gallon double ellipse elevated water storage tank located at 1107 Bristol Street in Adrian, Michigan. The work includes high pressure water cleaning (5,000 to 10,000 psi) and spot power tool cleaning to an SSPC-SP11 standard on the exterior, followed by the application of a three-coat epoxy urethane system and caulking between leg baseplates and concrete foundations. The wet interior requires abrasive blast cleaning to an SSPC-SP10 near-white metal standard, application of a three-coat zinc epoxy system, polyurethane caulk to the roof lap seams, removal and reinstallation of the cathodic protection system, and removal and reinstallation of the mechanical mixer after topcoat cure. The foundation is to be water cleaned and coated with a two-coat epoxy system. Repairs include installation of a riser manway, replacement of gaskets on the wet interior roof hatch and bolted painter’s hatch, overflow discharge modification, replacement of fall prevention devices, installation of a vandal guard and roof platform, installation of a wet interior ladder, modification of balcony access, installation of a roof handrail with painter’s railing, installation of bowl rigging couplings, removal of the painter’s railing from the wet interior, replacement of a damaged electrical junction box, and relocation of the aviation light. The contractor must account for more sanding to feather in edges of spot failures on the roof due to extensive topcoat delamination. Cost is to be included in the exterior overcoating bid. Pre-qualification requirements: Dixon Engineering will review qualifications of all contractors and determine their status based on experience, workmanship, successful project completions with Dixon, and contractor’s financial data. Contractors will be prequalified for different sized tanks and towers. Any contractor with projects in dispute or unfinished due to contract problems will not be prequalified. Prequalification protocol is detailed in the Instructions to Bidders. The Bidder shall submit all questions about the meaning or intent of the Bidding Documents to DIXON in writing. Contact information and submittal procedures for such questions are to be made to the Issuing Office. Question Deadline 01/01/2026

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
10
Bidding Soon
1,932
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

April 20, 2026

Project location map

1107 Bristol St, Adrian, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.