Demolition, site work, paving and outdoor lighting for a mixed-use development in Joliet, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

(2,577-Ft) The work consists of the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals ITS implementation, erosion and sediment control, landscaping, traffic control and protection, detour routing, pavement marking and signing, sidewalk. The project extends just east of Water Street to east of Gardner Street in the City of Joliet in Will County. Region 1 District 1 Federal Project # NHPPSCVU(428) County(s) Will Marked Route(s) I-80 Key Route(s) FAI 80 PPS #(s)1-77247-4350 1-77247-6800 1-77247-7000 1-77247-7200 Contract Specifics Completion Date: October 31, 2028 Plus 10 Working Days Questions not accepted as of January 06, 2026 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, December 26, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. The pre-bid meeting is mandatory for all potential prime contractors interested in bidding. Registered subcontractors are encouraged to attend. The meeting will begin at 10:00 AM at which time, after a final call for everyone to sign in, the sign-in sheets will be copied. Attendees who show up after the presentation is underway will not be allowed to sign-in thereby not being considered in attendance. Failure on the prime contractor's part to attend will cause the contractor's request for authorization to bid to be denied. IL DOT - 184 - Realignment and Reconstruction of the Mainline and Interchange Pavement The work consists of the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, installation of an enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, detour routing, pavement marking and signing, sidewalk, shared used path, and other related roadway items required to complete the project as indicated in the contract documentation. This work shall consist of visually recording detour routes and submitting recordings to the Department via storage devices and shall be in accordance with the applicable sections of the Standard Specifications. This work shall include providing the Department with a detailed visual recording of each detour route shown in the plans and/or as directed by the Engineer. This work shall consist of developing and implementing a detailed Dust Control Plan (DCP) in accordance with Article 107.36 of the Standard Specifications. Development of a DCP is required. All construction activities shall be governed by the DCP. Elements of the DCP will include and specify, at a minimum: 1. Mechanisms to limit tracking soil onto nearby publicly traveled roadways 2. Required speed reductions for Contractor vehicles on unpaved surfaces 3. Requirements for covering of haul vehicles, and 4. Application of dust suppressants (typically water based, calcium chloride, tarps) or water to exposed surfaces, particularly to vehicles and surfaces on which construction vehicles travel. This work shall consist of constructing concrete pavement and shoulders using extended life concrete at locations specified on the plans. Work shall be performed according to the Standard Specifications except as modified herein: This work shall consist of all labor, materials, and equipment necessary to construct class D patches at the locations shown on the plans and/ or locations determined by the Engineer in the field. The work shall be performed according to Section 442 of the Standard Specifications, except as modified herein. Delete Note 2 from Article 442.02 of the Standard Specification and replace with the following: "Note 2. The mixture composition of the HMA used shall be binder course and surface course as specified in the Hot-Mix Asphalt Mixtures Requirements table in the plans."

GC Bidding

Roads / Highways

$10,000,000.00

Public - State/Provincial

Demolition, Outdoor Lighting, Paving, Site Work

1477

8

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
78
Bidding Soon
3,424
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2026

March 17, 2026

Project location map

I-80, Joliet, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.