Site work for a transportation facility in San Rafael, California. Completed plans call for site work for a transportation facility.

As of February 05, 2026, this project has not yet been awarded. The project is expected to be awarded on April 06, 2026. East in San Rafael will include: (1) Development of wick drain plan (2) Establish erosion and storm water controls (3) Excavation and grading of existing soils (4) Installation of wick drains (5) Initial placement of surcharge fill in lifts (6) Wait for notification of adequate settlement (7) Second placement of surcharge fill in lifts (8) Stabilize site. The Contractor shall diligently prosecute the entire work to completion before the expiration of 30 working days. This excludes an estimated 120 calendar days of expected settlement time between phases 1 and 2 as stipulated in the contract documents. Question Deadline 01/09/2026 at 5:00 PM PT Questions Online Portal. DBE participation goal of 10.0% GENERAL REQUIREMENTS MOBILIZATION 1 Mobilization (Stage 1) 1.1 Contractor's Cost (Incl. Jobsite Management, Bonds and Insurance) 1 LS 1.2 Temporary Offices, Furnishings, and Equipment 6.0 MO 1.3 Traffic Control Systems 1 LS 1.4 Demobilization 1 LS 2 Remobilization (Stage 2) 1 LS 2.1 Demobilization 1 LS 3 PERMITS AND FEES ALLOWANCE SITE IMPROVEMENTS 4 Remove Tree 1 EA 5 Remove Drainage System 1 LS 6 Inlet Protection 8 EA 7 Earthwork 15,900 CY 8 Imported Borrow (Stage 1) 600 CY 9 Imported Borrow (Stage 2) 11,500 CY 10 Fiber Roll (Stage 1) 2,038 LF 11 Fiber Roll (Stage 2) 1,641 LF 12 Hydroseed (Stage 1) 90,555 SF 13 Hydroseed (Stage 2) 90,555 SF 14 6" PVC Pipe 461 LF 15 3" PVC Slotted Pipe 668 LF 16 Precast Drainage Inlet 2 EA 17 Sampling Tank (10 Gallon Min) 1 EA 18 Permeable Material 64 CY 19 Horizontal Strip Drain 34,400 SF 20 Prefabricated Vertical Drain (Wick Drain) 34,400 SF 21 Filter Fabric (Geotextile Separator Fabric) 4,285 SF 22 Piezometer 3 EA 23 Settlement Marker (Including Monitoring Risers) 8 EA 24 6" PVC Butterfly Valve 1 EA 25 Flow Meter 1 EA 26 Silt Fence 1,580 LF OTHER 27 All other work of CONTRACT not included in any of the above categories Crawford File No. 17-362.11 CONSTRUCTIONCOST ESTIMATE: The Design Engineer's opinion of probable construction costfor this project is approximately $803,309. This amount excludes permitting allocation

Bid Results

Transportation Terminals

$1,130,130.00

Public - County

Site Work

22

9

4

7

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
492
Active Projects
243
Bidding Soon
2,837
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

February 20, 2026

Project location map

1075 Francisco Blvd E, San Rafael, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.