Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 3, 2026 at 7:00 PM
Updated February 4, 2026
Renovation of a mixed-use development in Fort Wayne, Indiana. Completed plans call for the renovation of a educational facility.
**As of February 3, 2026, the project was awarded to the following subcontractors: Wolf Commercial Roofing Inc $481,250.00 Spg Roofing and exteriors LLC $771,495.00 Fort Wayne Roofing, A tecta America Co. $537,700.00 Titan Roofing Inc $675,700.00 Crosby Excavating Inc $619,155.00 ACB General Contractor $1,025,776.00 , with an awarded amount of $4,111,076.00** Bids shall be received from a single prime contractor. Each bid shall be accompanied by a certified check, a cashier s check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within ten (10) days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashier s check or bid bond forfeited to Fort Wayne Community Schools, as liquidated damages. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion. A bid may not be modified, withdrawn or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Community Schools. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids. Fort Wayne Community Schools reserves the right to assign all or any portion of any bid and/or contract to any non-profit building corporation controlled by Fort Wayne Community Schools without the consent of any other party, and any employee of Fort Wayne Community Schools may be designated by Fort Wayne Community Schools and/or any such non-profit building corporation to serve as the authorized agent or representative of such non-profit building corporation with respect to any such bid or contract. Doc Notes: Each bid proposal shall include all labor, material and services necessary to complete the projects in strict accordance with the drawings and specifications as prepared and on file in the office of : Blackbird Design Resources. Plans, specifications, instructions to bidders and bid forms are on file and available at Eastern Engineering s Virtual Planroom: online or are available at the office of Eastern Engineering located at 1239 North Wells Street, Fort Wayne, Indiana 46802, P: (260) 426-3119, F: (260) 426-3101. There will be shipping and handling charges for the delivery of each set of Bidding Documents.
Award
Educational
$4,111,076.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 7, 2026
February 6, 2026
Multiple Locations, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: Jan 06 2026
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: Jan 06 2026
Fort Wayne, IN
Bid Date: Jan 20 2026
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: Jan 22 2026
Fort Wayne, IN
Bid Date: Jan 21 2026
Fort Wayne, IN
Bid Date: Mar 13 2026
Fort Wayne, IN
--
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: Feb 20 2026
Fort Wayne, IN
Bid Date: Jan 13 2026
Fort Wayne, IN
Bid Date: Jan 15 2026
Fort Wayne, IN
Bid Date: Dec 23 2025
Fort Wayne, IN
Bid Date: Jan 15 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
