BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2025 at 7:00 PM

Updated December 18, 2025

Renovation of a civil project in Farmington, New Mexico. Conceptual plans call for the renovation of a water / sewer project.

The need for a portable pump station with generators aligns with the natural growth of the City of Farmington and will also provide great advantages in the event of an emergency. Currently pumps and generators are rented in the event of a severe water shortage to divert water from the San Juan River to Water Treatment Plant #1. The trailer mounted pumps and generator would address the emergencies and help bridge the need for a permanent pump station on the San Juan River until the volume of diversion warrants a permanent pump station. A city owned trailer mounted pump and generator system could also be designed to bypass pump stations allowing for minimal or uninterrupted service during planned maintenance or in the event of an emergency. The project is included in the City's 2027-2031 Capital Improvement Program (CIP). As of December 17, 2025, project is funded for FY2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$2,195,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
0
Bidding Soon
78
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2027

Project location map

To Be Determined, Farmington, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.