BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2026 at 7:00 PM

Updated February 20, 2026

Site work for a playground / park / athletic field in Mexico, Missouri. Completed plans call for site work for a one-story above grade playground / park / athletic field.

The City of Mexico, MO is accepting sealed proposals for the design and supervised installation of playground equipment at R.S. Green Park. Proposals should be sealed and clearly marked on the outside of the envelope "RFP R.S. Green Park Playground Equipment" and returned to the Administrative Services Department. The City reserves the right to accept or reject any and all proposals and to waive any formalities in the proposal process. Playground equipment is to be sited at Robert S. Green Park 501 South Muldrow Mexico, MO 65265 in the same general footprint as the existing playground equipment. Direct all questions to Chad Unterreiner or Tyler Roberts at 573.581.2100. Playground is to include elements for play from 5-12, climbing features, and no enclosed tubes or cabins. Equipment that features dynamic play activity with multiple levels of travel throughout the unit. A mix offlexible and static climbing surfaces, the structure challenges core strength and agility in a fun and creative way is desired. All components must be ADA compliant. No wooden components will be considered. All bare metal fasteners, bolts, screws, nuts, washers, joining plates, and other components used in the assembly of proposed equipment must be 18-8 or better stainless steel. Each component must have its own separate hardware package. Bulk hardware for the entire project will not be accepted. Signage language for age group usage and safe use requirements are desired. Installation crew leader will need to have their CPSI current at the time of installation. Vendor must deliver a statement that verifies correct installation of equipment and that installation meets conditions from supplier for full warranty of equipment. Any defects of installation that exist that would prevent vendor from certifying installation must be provided in writing after a post installation inspection. Notice to Proceed Week of February 9 ; Delivery of all proposed materials and hardware to site must be completed prior to June 1, 2026. Timing ofsupervised install may be negotiated after a delivery date is known.

Award

Playgrounds / Parks / Athletic Fields

$59,861.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
0
Bidding Soon
438
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2026

May 1, 2026

Project location map

501 S Muldrow St, Mexico, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.