BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2026 at 7:00 PM

Updated February 28, 2026

Demolition, site work and new construction of a water / sewer project in Hackettstown, New Jersey. Completed plans call for the demolition of a one-story above grade water / sewer project; and one-story above grade water / sewer project.

**As of February 27, 2026, the project was awarded to VNL INCORPORATED, with an awarded amount of $3,892,000.** **As of February 27, 2026, the project was awarded to UNDERGROUND UTILITIES, with an awarded amount of $2,022,529.** The work for the 1 MG water storage tank and its appurtenances includes demolition of the existing water storage tank, demolition of related appurtenances, removal of materials, construction of a valve vault, construction of a ground level water storage tank, retaining wall, site work, electrical work, and general construction. The work for the water main replacement includes replacing water mains downstream of the new 1 MG water storage tank and within Old Allamuchy Road, valves, fire hydrants, site work, and general construction. The two contracts can be bid together or separately. The work includes the furnishing of all labor, materials and equipment necessary to complete the work as shown on the Drawings and as described in the Specifications. The work for the 1 MG Water Storage Tank Project (Contract 52W-A) consists of the removal of the existing 1 MG water storage tank and its appurtenances on Block 4, Lot 30 and the installation of a new 1 MG water storage tank on Block 4, Lot 1.05. The work for the 1 MG Water Storage Tank Project is located off Old Allamuchy Road. The Water Main Replacement Project (Contract 52W-B) includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement Project is located downstream of the 1 MG water storage tank and within Old Allamuchy Road. Both Contracts are within Independence Township and include: site work, electrical work and general construction. The work for Contract 52W-A shall be completed within 730 calendar days and the work for Contract 52W-B shall be completed within 270 calendar days of the Contractor's receipt of written Notice to Proceed. The two Contracts can be bid together or separately. If the two Contracts are awarded to two separate Contractors, it should be noted that a portion of the Water Main Replacement Project (52W-B) must be complete before work on the 1 MG Water Storage Tank (52W-A) can begin (refer to IFB 0.21 and Scope Sections). Bid Result Contract No. 52W-A Reivax Contracting $3,680,000 Contract No. 52W-B Reivax $ 1,906,945

Award

Water / Sewer

$5,914,529.00

Public - City

Demolition, New Construction, Site Work

38

17

6

8

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2026

March 30, 2026

Project location map

Old Allamuchy Rd, Hackettstown, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.