BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 16, 2025 at 7:00 PM

Updated December 17, 2025

Site work for a municipal facility in Foster City, California. Conceptual plans call for site work for a municipal facility.

This project will rehabilitate the existing Corporation Yard fence which has been damaged by saltwater corrosion carried out by high winds. The fence was constructed in 1991 and extends approximately 1,500 feet along the perimeter of the City/District Corporation Yard on East Third Avenue and a portion along the west edge of Tank No. 4. It is an eight (8) foot high "woodcrete" structure (precast concrete fence that mimics the look of wood) that rests on a woodcrete retaining wall and foundation with built in drainage of varying depth. The fence serves as a protective barrier, ensuring the security of Parks, Public Works, and Fire Department equipment and vehicles and prevents unauthorized access from non-City personnel. Over the years corrosion has damaged the rebar within the fence which has compromised its structural integrity and made it vulnerable to weather events and forced entries. Staff has performed ongoing maintenance and repairs to address issues and multiple failures to the fence. The project will assess the condition of the existing fence and provide either a new fence or replacement of deteriorated panels. Portions of the landscaping on the north side of the fence may need to be removed and replaced to allow access for construction. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of December 17, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Municipal

$2,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
8
Bidding Soon
1,500
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.