BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2026 at 7:00 PM

Updated January 21, 2026

Site work, paving and renovation of a mixed-use development in Santaquin, Utah. Working plans call for the renovation of a municipal facility; for site work for a municipal facility; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of January 20th, 2026, the owner has determined a prequalified list of construction managers. A timeline for the award has not yet been established.** Project Description: Santaquin City is seeking to enter into an agreement with a qualified and motivated Construction Manager/General Contractor (CM/GC) firm to provide Construction Manager/General Contractor services for assisting the City and the City's contracted Architect with detailed final design and construction of two (2) new post frame buildings with related facilities and appurtenances ("Projects"). Both post frame buildings have been constructed. However, the building interior equipment, interior finishes, and site improvements have not yet been completed. The recreation building is located adjacent to the existing recreation activity building at 200 South 400 West, Santaquin, Utah. The cemetery building is located at 269 South 100 East, Santaquin, Utah. The Project will include Right-of-Way Improvements, Site Improvements, including Parking Areas, HVAC, electrical equipment, interior building finishing, Asphalt Drive, Drive Access, Curb and Gutter, Concrete Flat Work, Storm Drainage Facilities, Landscaping, Site Lighting, Landscaping, etc. Question Deadline 01/08/2026 at 5:00 PM MT Online Any questions regarding this RFP must be submitted in writing to the City Contact jlundell@santaquin.gov Service Access/Construction Access & Staging The Sites should provide ample room for construction of the new building completion and Site work as well as access and staging for the CM/GC. A safe worksite must be maintained at all times. Worksite safety is the responsibility of the CM/GC. Emergency vehicle access must be maintained by the CM/GC and subcontractors at all times to and from sites. The recreation building is located adjacent to the existing recreation activity building at 200 South 400 West, Santaquin, Utah. The cemetery building is located at 269 South 100 East, Santaquin, Utah.

Final Planning

Municipal

$725,000.00

Public - City

Paving, Renovation, Site Work

4

7

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
0
Bidding Soon
613
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2026

May 13, 2026

Project location map

Multiple Locations, Santaquin, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.