Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 9, 2026 at 7:00 PM
Updated January 10, 2026
Site work for a water / sewer project in Bethany, Missouri. Completed plans call for site work for a water / sewer project.
The project includes installation of 550 feet of 4-inch waterline to realign the current parallel waterlines that run beneath the bridge on E. 165th Street in preparation for future bridge repairs. The waterline installation includes a stream crossing with steel casing for each relocated waterline, valves, valve access vaults, and trace wire in accordance with the project drawings. All bidders must purchase plans through Great River Engineering, Inc. and be on the planholder list in order to bid the project. The contract requires payment of the prevailing hourly rate of wages as determined by the Missouri Department of Labor and Industrial Relations, and the United States Department of Labor, with payment of the higher of these two rates. Contractors and subcontractors must provide a 10-Hour OSHA construction safety program or similar approved program for on-site employees within sixty days of beginning work. A certified cashier's check or a bid bond in the amount of 5% must be submitted with each proposal. The project will be awarded to the lowest, responsive, responsible bidder. No 2nd tier subcontracting will be allowed on this project. The Harrison County Commission reserves the right to reject any or all bids. No 2nd tier subcontracting will be allowed on this project. A. Extent of each type of dampproofing work is indicated on drawings and as follows: 1. Manholes, all types and locations. 2. Valve Vaults. 3. All underground tanks. 4. Similar work used as exposed finish is excluded by definition and, if required, is specified as waterproofing, vapor barrier, roofing, flooring, special coating or other appropriate category. B. This Section includes the following: 1. Cold-applied, cut-back asphalt dampproofing. Questions should be directed to the Engineer of Record. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered
Bid Results
Water / Sewer
$200,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 7, 2026
February 6, 2026
E 165th St, Bethany, MO
Related To This Project
Bethany, MO
Bid Date: Dec 17 2025
Bethany, MO
--
Bethany, MO
--
Bethany, MO
--
Bethany, MO
Bid Date: Jan 20 2026
Bethany, MO
Bid Date: Nov 25 2025
Bethany, MO
Bid Date: Nov 05 2025
Bethany, MO
Bid Date: Jul 29 2025
Bethany, MO
Bid Date: Aug 27 2025
Bethany, MO
Bid Date: May 19 2025
Bethany, MO
Bid Date: Apr 29 2025
Bethany, MO
Bid Date: Mar 04 2025
Bethany, MO
--
Bethany, MO
Bid Date: Jan 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
