Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 8, 2026 at 7:00 PM
Updated January 9, 2026
Renovation of a municipal facility in Bemidji, Minnesota. Completed plans call for the renovation of a municipal facility.
The project consists of replacing two rooftop units (RTUs) and their associated equipment curbs. The RTUs and plenum curbs will be purchased directly by the Owner, while the Contractor will provide all labor, materials, and services necessary for installation. Removal of the existing RTUs and installation of the new units will occur during a planned three-day air outage beginning on a Saturday, with the exact date selected by the Contractor from an acceptable range provided later in this document. Airflow must be restored by Tuesday (Day 4) following the outage. Final piping connections, miscellaneous equipment installation, Owner-provided equipment startup, and controls will be completed after the outage window. The scope also includes all electrical power modifications and roof patching required to accommodate the new RTUs, as well as coordination with the Owner's BAS contractor, who will be contracted directly by the Owner. In addition, the Contractor shall review the Owner-provided RTUs and associated plenum curbs for fit and compatibility with existing field conditions before equipment is procured. Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 60 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. Bids will be received for the prime contract including all work to be performed. A. Bidders shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. Start of construction to be August 17th, with final completion no later than September 30th. If the contractor fails to complete the work within the time specified in the contract, or any extension, the Contractor shall pay to the Owner as liquidated damages, the sum of $200.00 for each day past the agreed upon completion date. This is not a penalty, but rather liquidated damages for each calendar day that the Contractor shall be in default after the time specified for the completion of the work. Liquidated damages are specified due to actual damages, which the Owner would sustain as a result of the delay. A. Assembly including casing, coil, fan, and motor in horizontal discharge configuration with adjustable discharge louvers. B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. C. Comply with UL 2021. D. Comply with UL 823. A. Heating System 1. The scope of work shall include a complete chemical cleaning as specified in this section of all new piping and existing piping upstream of the isolation valves. Existing fluid shall be reused after testing is completed. Contractor is responsible for all additional system fluid for the additional new piping and equipment.
Post-Bid
Municipal
$200,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 7, 2026
August 17, 2026
616 America Ave NW, Bemidji, MN
Related To This Project
Bemidji, MN
Bid Date: Jan 07 2026
Bemidji, MN
Bid Date: Dec 30 2025
Bemidji, MN
Bid Date: Jan 07 2026
Bemidji, MN
Bid Date: Jan 08 2026
Bemidji, MN
Bid Date: Jan 28 2026
Bemidji, MN
Bid Date: Jan 19 2026
Bemidji, MN
Bid Date: Feb 03 2026
Bemidji, MN
Bid Date: Feb 06 2026
Bemidji, MN
Bid Date: Jan 13 2026
Bemidji, MN
Bid Date: Oct 22 2025
Bemidji, MN
Bid Date: Oct 16 2025
Bemidji, MN
Bid Date: Oct 07 2025
Bemidji, MN
Bid Date: Oct 06 2025
Bemidji, MN
Bid Date: Sep 10 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
