BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2025 at 7:00 PM

Updated December 19, 2025

Demolition, site work and paving for a bridge / tunnel in Junction City, Wisconsin. Completed plans call for the demolition of a bridge / tunnel.

The scope of work includes replacing the existing 36-inch concrete culvert pipe with a 48-inch reinforced concrete culvert pipe. Work also involves excavation and fill for the culvert replacement, placement of base aggregate dense, riprap installation, and asphaltic surface paving along a 100-foot project length. The culvert is currently submerged, so dewatering will be necessary and contractors should determine specific dewatering methods. Sheet piling coffer dams are anticipated to be needed. Contractors are encouraged to complete the culvert replacement and in-stream work before March 14th to utilize expected low water levels, if this is fiscally advantageous. There is an in-stream timeout restriction from March 14 through June 15, during which no work can occur. If work is not completed during the winter drawdown period, all remaining work must occur between June 15th and August 1st, 2026. Project documents provide more information regarding water levels.

GC Bidding

Bridges / Tunnels

$100,000.00

Public - City

Demolition, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
16
Bidding Soon
496
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

February 22, 2026

Project location map

Lake Road, Junction City, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.