Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 15, 2026 at 7:00 PM

Updated January 16, 2026

Site work and paving for a mixed-use development in Eau Pleine, Wisconsin. Completed plans call for site work for a bridge / tunnel; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The existing 36-Inch concrete culvert pipe is to be replaced with a 48-inch reinforced concrete culvert pipe. Additional work includes excavation and fill for culvert replacement, base aggregate dense, riprap placement, and asphaltic surface paving. The project length is 100' long. The culvert is submerged underwater, so dewatering will be required. Sheet piling coffer dams are anticipated to be needed, but specific dewatering methods are to be determined by the contractor. Water levels controlled by the local dam operators are expected to recede in February and March, which could greatly reduce dewatering efforts required. Contractors are encouraged to complete culvert replacement and in-stream work prior to March 14th to take advantage of low water levels, if deemed fiscally advantageous. See project documents for more information about projected and past winter water levels. Items of work include consists of removing small culvert pipe, excavation for structures culverts, base aggregate dense, heavy riprap, borrow, installing Culvert Pipe Reinforced Concrete Class III 48-Inch, finishing items, erosion control items, traffic control, and any incidental items necessary to complete the work. All material and work performed shall be in accordance with the Wisconsin Department of Transportation Standard Specifications and the Project's Special Provisions. Bid items and quantities listed within the plans are for information purposes only. Bidding and construction phase will be based on the enclosed Bid forms. A culvert replacement construction project on Lake Road. Approximately 0.4 miles southeast of the intersection with Altenburg Road. Contract completion time is 20 working days, All questions about the meaning or intent of the Bidding Documents are to be submitted to DESIGNER/OWNER'S REPRESENTATIVE by 2 PM on Friday, January 2nd, 2026. Interpretations or clarifications considered necessary by DESIGNER/OWNER'S REPRESENTATIVE in response to such questions will be issued by Addenda and posted to the Quest Website listed in the Advertisements for Bid. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Award

Bridges / Tunnels

$191,383.00

Public - City

Paving, Site Work

8

8

2

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
41
Bidding Soon
749
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

February 9, 2026

Project location map

Lake Rd, Eau Pleine, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed