Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 20, 2026 at 8:00 PM
Updated July 26, 2026
Site work and new construction of a power facility in Colorado Springs, Colorado. Completed plans call for the construction of a power facility; and for site work for a power facility.
Introduction 1.1. UTILITIES is a four-service municipally-owned utility with a mission to provide safe, reliable, competitively-priced electric, natural gas, water and wastewater services to its citizen owners and customers. UTILITIES operates primarily through functional divisions responsible for planning, designing, financing, constructing, operating, customer service, environmental, strategy, and external affairs associated with the delivery of these utility services. 1.2. The APIP project will provide electric service requirements to support the full buildout of Airports Peak Innovation Park. The APIP substation will be constructed on land owned by UTILITIES and transmission lines will tap into an existing 230kV transmission double circuit line owned by UTILITIES. (See Diagram 1). New easementsfor the transmission taps will be acquired by UTILITIES once the CONTRACTOR identifies easement requirements. 1.3. The APIP to Williams Creek Transmission Line will be designed and built within existing easement controlled by UTILITIES. UTILITIES will provide drawings of easements and existing transmission lines to CONTRACTOR to aid in design upon award of contract. 1.4. The Scope of Work consists of a base scope with four specific projects as further defined in Section 3 and five optional projects as further defined in Section 18. Base Scope of Work CONTRACTOR shall perform the scope of work for Projects 1 through 4 to include but not limited to the following. 1.5. Project 1: Design and construction of a 230kV electric switching substation (APIP Substation) prepared to accept load elements along with 6 overhead 230kV connections detailed in Project 2 and Project 4. Substation design shall include fiber connections between substation and CSU Trunk Line as well as stormwater detention pond to accommodate flows from substation property. 1.6. Project 2: Design and construction of two (2) double-circuit overhead transmission line-ties from APIP Substation to an existing 230kV double-circuit overhead transmission line. See Attachment A20 Attachment A19 APIP Substation Transmission Tap Layout.pdf. 1.6.1.1. North Tap: 2 heavy dead-ends on either end of tap with 1 tangent. 1.6.1.2. South Tap: 3 heavy dead-ends with 2 tangents. 1.7. Project 3: Reconductor of existing 230kV Overhead lines between Horizon and Claremont Substations. 1.7.1.1. Existing line is 5.9 miles long and contains 34 structures, 5 heavy dead-ends, 3 light dead-ends, and 26 tangent structures. CONTRACTOR shall complete the re-build of line as required to meet the ampacity requirements, using bundled 1272 ACSR. 1.7.1.1.1. 1 tangent shall be replaced with a new heavy dead-end when North Tap is inserted. 1.7.1.1.2. 1 dead-end shall be replaced when South Tap is inserted. 1.7.1.1.3. 1 dead-end shall be replaced when North and South Tap are inserted. 1.8. Project 4: Design and construction of a 230kV double-circuit overhead transmission line from APIP Substation to Williams Creek Substation. Question Deadline 01/30/2026 at 2:00 PM MT
Award
Solar Power Generation
$90,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2026
May 20, 2026
To be determined, Colorado Springs, CO
Related To This Project
Colorado Springs, CO
--
Colorado Springs, CO
Bid Date: Jan 21 2026
Colorado Springs, CO
Bid Date: Feb 05 2026
Colorado Springs, CO
--
Colorado Springs, CO
Bid Date: Feb 09 2026
Colorado Springs, CO
Bid Date: Jan 23 2026
Colorado Springs, CO
--
Colorado Springs, CO
Bid Date: Jan 15 2026
Colorado Springs, CO
Bid Date: Jan 02 2026
Colorado Springs, CO
Bid Date: Feb 02 2026
Colorado Springs, CO
Bid Date: Jan 05 2026
Colorado Springs, CO
Bid Date: Dec 29 2025
Colorado Springs, CO
Bid Date: Feb 05 2026
Colorado Springs, CO
Bid Date: Jan 16 2026
Colorado Springs, CO
Bid Date: Jan 14 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed