BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 19, 2025 at 7:00 PM

Updated January 9, 2026

This is a service / maintenance or supply contract in Belleville, Illinois. Contact the soliciting agency for additional information.

The proposal consists of furnishing long lead material including the transformer and switchgear needed for the proposed Metro Transit IL Bus Garage EV Charging Stations. Financial assistance for this project is being provided in whole or in part by the State of Illinois, Illinois Department of Transportation. The successful bidder will be required to comply with all applicable Equal Employment Opportunity and prevailing wage rate laws and regulations. No less than the prevailing rate of wages, as determined in accordance with the Illinois Prevailing Wage Act, shall be paid to all laborers, operators, teamsters, masons, plumbers, and any workers employed in the construction on this project. Bids shall remain open to acceptance and shall be irrevocable for a period of ninety (90) calendar days after the opening of the bids. Bidders that wish to bid on this project must be registered with the Illinois Department of Human Rights (IDHR) by filing an Employer Report Form (PC-1) with the IDHR Public Contracts Unit (PCU).

Post-Bid

Transportation Terminals

$1,000,000.00

Public - County

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
74
Bidding Soon
1,471
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

February 22, 2026

Project location map

To be determined, Belleville, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.