BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 26, 2025 at 7:00 PM

Updated December 27, 2025

Site work for a road / highway in West Covina, California. Completed plans call for site work for a road / highway.

Foothill Transit is issuing this Request for Qualifications seeking statement of qualification submittals from qualified firms or individuals to participate in a subsequent Request for Proposals (RFP) for design-build services for the Transit Signal Priority Engineering and Corridor Readiness project along the Foothill Transit Lines 187/188 corridor (Project). The scope of work for the Project includes all design-build services necessary to evaluate the existing signal controllers' readiness for TSP at the intersections, and if necessary, purchase, program, and install signal controllers and firmware that accept the TSP protocols, as more fully described in Part II of this RFQ. Question Deadline 01/20/2026 at 2:00 PM PT Online Q&A Yes This RFQ is the first phase in the procurement of a design-build contractor in accordance with California Public Contract Code 22160-22169. This RFQ will pre-qualify and shortlist design-build entities for the second (RFP) phase of the procurement. Response Types Response File Type of Award Lump Sum All communications regarding this RFQ shall be addressed to procurement@foothilltransit.org. The selected contractor will provide a cloud-based transit signal priority (TSP) system along the Line 187 and Line 188 Corridors which travel through the following streets: Colorado, San Gabriel, Foothill Blvd., Rosemead Blvd., Huntington Dr., Azusa Ave., San Gabriel Ave., Citrus Ave., Alosta Ave., Route 66, Claremont Blvd., 1st Steet, Indian Hill Blvd., Arrow Hwy, Monte Vista Ave., Moreno St., Central Ave., and Richton. Line 187 is one of Foothill Transit's highest ridership routes. Foothill Transit is seeking a cloud-based TSP system that can utilize the GTFS-RT data feed from the agency's Avail Technologies CAD/AVL system, without the need to install additional equipment on the buses. Foothill Transit would also like the system to have the ability to interface with the LA County RIITS system if needed at a future date. Aside from the implementation of the TSP system, the selected contractor will be responsible for making the intersections in the project area TSP-compatible. Specifics tasks will include the design, purchase, programming, configuration, and installation of jurisdiction-approved signal controllers, communications between the TSP system and the signal controllers, and any programming or configurations needed for the cloud-based TSP system.

Sub-Bidding

Roads / Highways

$1,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
606
Active Projects
250
Bidding Soon
3,523
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

October 12, 2026

Project location map

Multiple Locations, West Covina, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.