BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated February 5, 2026

Site work for a municipal facility in Milton, Florida. Completed plans call for site work for a municipal facility.

This project is to demonstrate the effective design, implementation, and maintenance of green infrastructure (GI), tree boxes(planters), biofiltration systems, and permeable surface throughout the 8.6-acre Santa Rosa County Administrative Complex. All the design and engineering have been completed by Santa Rosa County. This project will be the actual permitting and construction of the designed and engineered completed site plan for the Santa Rosa County Administration Building. A federal grant has been awarded to be applied toward this project. Thus, two bids are being solicited. One for the entire site and an alternate bid for a section of the project. Clearing and Grubbing of the areas required for the installation of the works of upgrading as is shown on the plan drawings. Clearing and Grubbing shall be limited only to those areas designated in drawings. All other areas shall be left undisturbed. County will be responsible for purchasing select plants and trees and will coordinate with selected contractor regarding delivery and installation. Clearing and Grubbing, Structure Removal , Construction Surveys, Mobilization and Demobilization , Removal of Water, Biofilters-Focal Point 1-9 Complete and In Place, Excavation-Focal Point 1-9 Per Plans, Earthfill-Placement of Earth Material, Earthfill-Focal Point 1-Complete and In Place, Drainfill-Within Focal Point and Urban Forest Systems, Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place), Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels, Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings, Steel Reinforcement-For Concrete Structures, Plastic Pipe-4" Diam. HDPE Pipe, Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap, Rock Riprap-Drainage Swales within Landscape Islands The Board encourages participation from all segments of the business community, including small businesses, minority/women owned businesses, and disadvantaged business enterprises. The Board reserves the right to waive irregularities in bids, reject any or all bids for sound documented reasons, and to award the bid in the best interest of Santa Rosa County. Question Deadline 02/06/2026 at 12:00 PM CT Questions concerning this request should be submitted through the procurement portal Completion- 180 days

GC Bidding

Municipal

$10,000,000.00

Public - County

Site Work

25

9

4

7

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
36
Bidding Soon
737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2026

April 13, 2026

Project location map

6495 Caroline St, Milton, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.