Published February 18, 2026 at 7:00 PM

Updated February 19, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Springfield, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For the Pump house Road Bridge Repair Project. The Project will restore limited functionality (load limit of 90 psf)) to the now-closed early 20th century steel truss Pump house Road bridge across Beaver Creek south of Old Reid Park in Springfield, Ohio. The project will encompass removal of the existing (asphalt and wood) deck, installation of new steel stringers, installation of a new wooden deck and railings, and certification by an Ohio professional engineer that the post-project load capacity is at least 90 psf. Bids must be submitted on the form included in the bid package, and must be accompanied by a bid guarantee meeting the requirements of Section 153.54 of the Ohio Revised Code. All bids will be considered valid until thirty (30) days after bid opening, unless previously accepted or rejected. The SCD reserves the right to reject any or all bids and to waive technical defects in any bid when in its best interest. The Project contractor ("Contractor") shall perform the following work in accordance with the Project plans and specifications (attachments 1 and 2) and the terms and conditions listed herein: remove the existing (asphalt and wood) bridge deck; provide and install new steel stringers; provide and install a new wood bridge deck and new wood railings with timber posts; provide certification by an Ohio professional engineer that the post-Project load rating of the Bridge is at least ninety (90) p.s.f.; and post the new load limit on the Bridge. The Project contemplates reduction of the width of the Bridge deck from 14' to 10' in order to achieve the desired load rating. All work by the Contractor must be coordinated with SCD, the City, and the Clark County Park District (which maintains the Buck Creek trail for SCD). The City may inspect the work to verify adherence to the plans and specifications. The Contractor shall: furnish all materials, supplies, tools, equipment, labor, and supervision necessary for the proper execution and completion of the Project work; secure any required permits prior to commencement of the work; guarantee its workmanship and materials furnished for a period of one year from the date of Project completion; and, upon completion of the work and before acceptance and final payment, remove and properly dispose of all spoils, clean all areas occupied by the Contractor of all rubbish, debris, materials, and equipment, and repair any damage to the Bridge, the approaches, or the surrounding area incidental to the work. No in-stream work is contemplated, and none shall be undertaken without first securing appropriate permits. No equipment or temporary fill may be placed below the ordinary high-water mark of Beaver Creek. The Contractor shall take all appropriate measures to ensure that debris from the Project does not enter the waterway. If Project debris enters Beaver Creek during construction, the Contractor shall immediately remove same, utilizing equipment staged above the ordinary high-water mark.

Post-Bid

Bridges / Tunnels

$300,000.00

Public - County

Demolition, New Construction, Paving, Site Work

5

2

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
0
Bidding Soon
1,190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

February 20, 2026

Project location map

Pumphouse Rd, Springfield, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.