BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 31, 2025 at 7:00 PM

Updated January 1, 2026

Site work and paving for a mixed-use development in Springfield, Ohio. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and road / highway.

CLA-CR333-11.35 The preparation and execution of Right of Way Acquisition Services for pedestrian improvements in the City of Springfield. The project consists of the construction of sidewalk on both sides of Bechtle Avenue from Hillcrest Avenue north to the Walmart Traffic Signal and along the north side of Hillcrest Avenue from the Meijer entrance to Bechtle Avenue as well as updated pedestrian facilities and signal timing. It is estimated there will be 1 SH parcel and 23 temporary parcels requiring acquisition. Prequalification Requirements for This Agreement Are Listed Below. For All Prequalification Categories Other Than Financial Management System Evaluation the Requirement May Be Met by the Prime Consultant or a Subconsultant. It is anticipated that the selected Consultant will be authorized to proceed by February 2026. To meet ODOTs schedule, all Right-of-Way Acquisitions for this project must be completed by November 2026 or earlier if possible. The method of contractor selection has not been determined at this time. OH DOT - RFP Engineering - Preparation and Execution of Right of Way Acquisition Services for Pedestrian Improvements

Conceptual

Sidewalks / Parking Lot

$1,524,536.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
0
Bidding Soon
1,213
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2026

Project location map

Multiple Locations, Springfield, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.