BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2025 at 7:00 PM

Updated December 31, 2025

Site work and renovation of a pre-engineered storage facility in Virginia, Minnesota. Completed plans call for the renovation of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Project B2410763 Adolfson & Peterson Construction Virginia HQ Campus Project 1 SS on Behalf of MnDOT - Bid Package 2 Site Directions: Minnesota Department of Transportation MNDOT Virginia Headquarters Campus Project Bid Package 2: Concrete, Precast, and Steel 101 Hoover Road North Virginia, MN 55792 Saint Louis County All prime bidders must be prequalified through the Construction Manager prior to submission of their final bid response. Requests for prequalification shall be submitted to the Adolfson & Peterson Construction authorized contact listed at the bottom of this advertisement. Prequalification requests must be submitted no later than January 13th, 2026. No independent, unescorted observations of the premises are allowed. This scheduled meeting time will be the only observation access to the premises provided during the bidding period. The in-person Pre-Bid Meeting format and site visitation will adhere to current health safety guidance and policies provided by the Minnesota Department of Health (MDH) and Centers for Disease Control and Prevention (CDC) in an effort to reduce the spread of contagious viruses. Prospective attendees exhibiting any cold or flu-like symptoms are asked not to attend in-person meetings and site visitations. Responders are responsible for sending attendees who meet the requirements in effect at the time of the Pre-Bid Meeting. The Construction Manager, Architect, Owner's Project Representative, and/or Owner will review procedures, documents, and other conditions related to the bidding process with interested Responders. A site walk-through will occur immediately following the meeting. The MnDOT Virginia Headquarters Bid Package: Salt Storage Shelter will include bidding the below work scopes: The MnDOT Virginia Headquarters Bid Package 02: Concrete, Precast, Structural Steel Supply and Installation will include bidding the below work scopes: CONTRACT 03A - CONCRETE - Supply and Installation CONTRACT 03B - PRECAST - Supply and Installation CONTRACT 05A - STRUCTURAL STEEL - Supply CONTRACT 05B - STRUCTURAL STEEL - Install Unit Prices to be included with this Contract (see Section 01 22 00 "Unit Prices") Alternates to be included with this Contract (see Section 01 23 00 "Alternates") This project has a 7% (seven percent) Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goal established for the Construction Manager. Question Deadline 01/09/2026 Authorized Contact for bidding inquiries and questions: David Jaeger Senior Project Manager Adolfson & Peterson Construction 612-366-3281 davidjaeger@a-p.com Each bid shall be accompanied by a bid security in the form of a bid bond in a sum equal to five percent (5%) of the maximum bid price, executed by the Bidder as principle and by surety company authorized to do business in the State of Minnesota, payable to Adolfson & Peterson Construction, conditioned that if the principle's bid be accepted and the contract awarded to the Bidder, the Bidder will within ten (10) days after Notice of Award has been executed, will execute and effect a contract with Adolfson & Peterson Construction in accordance with the terms of the Bidders bid and a contractor's bond as required by law and regulations. Responders must upload a copy of their surety bond as prompted in the online Virtual Plan Room. Adolfson & Peterson Construction reserves the right to require the Bidder to provide the original surety bond to them. If such a request is made, the Bidder must submit the original surety bond within seven (7) calendar days upon receipt of the request. If the original surety bond is not received within seven (7) calendar days of receipt of the request, Adolfson & Peterson Construction may take action including rejection of the response or cancellation of the contract for cause. Question Deadline 01/09/2026 No Bids may be considered if it does not fully comply with the requirements of this Advertisement for Bids and any Bids received that are deficient with the requirements of this section will be returned to the Bidder immediately. Prevailing wages apply. Also see specification section on Project Labor Agreement. Bids will be awarded on the basis of the lowest qualified, responsible, and responsive Bidder as determined most favorable to the State's best interest. The State reserves the right to reject any and all Bids, to waive any informality in any Bid, and to hold all Bids for a period of sixty (60) days from the date of opening Bids.

Sub-Bidding

Warehouse / Distribution - Pre-Engineered Storage Building

$19,391,805.00

Public - State/Provincial

Renovation, Site Work

512

35

2

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
13
Bidding Soon
192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2026

March 23, 2026

Project location map

101 N Hoover Rd, Virginia, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.