Demolition, site work, paving and outdoor lighting for a mixed-use development in Santa Ana, California. Completed plans call for the demolition of a road / highway; for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a road / highway; and road / highway.

The scope of work consists of widening Warner Avenue from 4 lanes to 6 lanes along Warner Avenue from Oak Street to Grand Avenue. Major components include demolition of existing facilities, relocation of overhead utility lines and poles, excavation, construction of reinforced concrete pipes, catch basins and inlets, grading, removal and replacement of asphalt concrete pavement, asphalt concrete overlay, concrete flatwork improvements (sidewalks, curb and gutters, curb ramps, bus pads, and driveways), landscaping, irrigation, installation of sound walls, water quality BMPs, installation and modification of traffic signals, signage and striping, street lights, improvements at the UPRR railroad tracks, and off-site improvements at Cherry Aerospace. Additionally, the Warner Avenue Protected Bike Lane Project consists of constructing a protected bike lane, including excavation, grading, construction of Portland Cement Concrete bike lane, sidewalk, concrete bus pad, and related signage and striping. License Requirements California Class A General Contractors Online Q&A Yes Q&A Deadline 02/18/2026 2:00 PM (PST) Project No. KHA-18-001, 18-6901, 26-6427 This Project does not have DBE, SBE, DVBE requirement. Liquidated Damages $9,250 per calendar day. Project Duration 300 Working Days Ross Annex 20 Civic Center Plaza Santa Ana, CA 92701 The schedule should assume City Council Award March 17, 2026 and Notice To Proceed April 1, 2026. The Warner Avenue Improvements Phase 2A, Project No. 18-6901 and 23-6628, consists of widening Warner Avenue from 4 lanes to 6 lanes along Warner Avenue from Oak Street to Grand Avenue. Major components of work include, but are not limited to, demolition of existing facilities, overhead utility lines and poles relocation, excavation, construction of reinforced concrete pipes, catch basins and inlets, grading, removal & replacement of asphalt concrete pavement, asphalt concrete overlay and concrete flatwork improvements (sidewalks, curb and gutters, curb ramps, bus pads, and driveways) landscaping, irrigation, installation of sound walls, water quality BMPs, installation of traffic signals, traffic signals modifications and signing & striping, street lights, improvements at the UPRR railroad tracks, and off-site improvements at Cherry Aerospace. The Warner Avenue Protected Bike Lane Project No. 20-6971, CML5063(200) consists of construction a protected bike lane. Major components of work include, but not limited to excavation, grading, constructing Portland Cement Concrete bike lane, sidewalk, concrete bus pad and signing & striping Pre-Bid Job Meeting: No Pre-Bid Job Meeting.

Bid Results

Roads / Highways

$21,190,000.00

Public - City

Demolition, Outdoor Lighting, Paving, Site Work

104

22

155

11

Subscribe For Documents

162 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
3
Bidding Soon
2,200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2026

April 28, 2026

Project location map

E Warner Ave, Santa Ana, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.