Remodeling of a playground / park / athletic field in Miami, Florida. Completed plans call for the remodel of a playground / park / athletic field.
CONTRACTOR must obtain and submit all permits prior to performing any work. CONTRACTOR shall review all documents, specifications, and scope of work provided by Miami-Dade County Parks, Recreation, and Open Spaces Department for work to be completed. Furnish all labor, equipment, and materials required to comply with the intent of the work described in the contract documents including but not limited to: Multiple Surface Painting Applications at Miami Dade County Park Facilities South of Tamiami Trail (Southwest Eighth Street). Work is further described in the contract documents. Bidder or Bidder's Subcontractor shall have completed at least two projects of similar size and scope; in lieu of the references from the Bidder or Bidder's Subcontractor, the County will consider the references from Bidder's key personnel. Bidder shall provide evidence of this experience, project names, dollar values, and contract information for verification. This information should be entered on form 00450 Bidder's Statement of Qualifications and Business References, highlighting at least two comparable projects and using additional pages as needed. Bid Documents must be requested directly from the Parks, Recreation and Open Spaces Department or the bid may be deemed non-responsive. All requests for information must be submitted in writing. No phone calls will be accepted. Verbal statements not contained in an RPQ or addendum are not binding on the County and should not form the basis for a bidder's response to an RPQ. 1. CONTRACTOR shall review all documents and scope of work provided by Miami-Dade County Parks, Recreation and Open Spaces Construction Division for work to be completed. Furnish all labor, equipment and materials required to complete: Multiple Surface Painting Applications at Miami Dade County Park Facilities South of Tamiami Trail, (Southwest Eighth Street). 1.1) Contractor shall submit unit cost for painting applications to multiple surfaces to include concrete/stucco, metal, wood, plastic, fiberglass, structural foam. 1.2) Contractor shall be required to submit unit cost for materials and labor to complete painting applications to correct surfaces as listed on Bid form. 1.3) All work applies to exterior/interior of buildings (doors, walls, concrete / wood / plastic / steel and aluminum surfaces), picket fencing, perimeter walls, signs (wood/aluminum/steel/structural foam), walkways, etc. as noted. 1.4) Contractor will be required to move all items (I.e. furniture etc.) where painting applications apply, parks staff to assist in direction and placement of items before priming/painting applications. 1.5) The Department may utilize this contract at the hourly labor rate stated on the Bid Form for painter and painter helper to assist Parks personnel. 1.6) The minimum work will be 500 sq. ft. 1.7) From Bid Form Columns A-H will be the pay items plus 15% mark-up on materials. 1.8) Minimum company size will be two (2) painters and two (2) painter helpers. Bidders shall provide any information requested by the Department to show they have the capacity to perform the work specified in this RPQ. 1.9) Each work estimate shall include: location of the work, description of the service provided, unit price of the service, quantity (Sq. ft. of Ln. ft.), extended total price. 1.10) When providing estimates for approval, the maximum height shall be 25 Ft. 1.11) Exterior Colors: walls, security grates/bars and shall be (Sunstraw), Soffits shall be (Pure White), exterior doors/jambs both sides and fascia shall be (Green Garden). 1.12) Interior Colors: walls, ceilings, doors/jambs both sides shall be (Pure White), restroom/shower room walls and ceilings shall be (Epoxy White) 1.13) Note: All natural brick, rock, decorative designs etc. on buildings to be painted, shall remain natural/ unpainted. (Specific areas will be directed by construction supervisor at the pre-bid meeting) 1.14) Pressure cleaning of all exterior walls, soffit, fascia, security grates and doors of buildings also to include walkways to entry from public parking lots/streets with a minimum 3000-PSI will be required. ALL INTERIOR SURFACES will be cleaned as required to insure a complete bond for paint/sealer applications, repair damaged areas as required with correct materials to match existing surfaces. 1.15) Scrape all areas of exterior that pressured water was unable to remove chipped paint, interior surfaces were paint flaking apply will be scraped and correct finish materials will be used to match existing surfaces. 1.16) All metal surfaces i.e. doors/jambs, security grates, steel columns etc. showing surface rust or rust flaking will be sanded/grinded to original surface, All doors/jambs shall be sanded using a (Mechanical sander) with a 150-grit paper prior to the primer coat. Raw metal will be coated with a (DTM) Direct to Metal primer coat. 1.17) All cracks, holes and heavy paint flaking areas will be filled with flex-lock product, chalk all areas around door frames, windows, etc. for complete primer coat finish, stucco patch required to complete in areas as directed by construction supervisor (areas where stucco finish require repair will apply). 1.18) Materials shall be 100% acrylic latex, alkyd oil base, direct to metal, stain (concrete/wood applications), primer compatible to all surface conditions and manufactures specifications. All materials used shall be of equal and/or greater quality per manufactures listed: Richards-100% acrylic latex Signature-750 Series, Flood CWF-UV, Richards high gloss aluminum enamel # 1011, Richards direct to metal, Zinsser/123 acrylic primer, PPG/waterborne epoxy (2 components) 1.19) Primer one coat to all exteriors/interiors of buildings, oil and latex primers will be applied to correct surfaces, primer will be compatible to paint manufacture. 1.20) Note: If primer coat does not prevent Bleed-Through and completely (Block out/Cover) existing paint, a second primer coat shall be applied to all doors/jambs, building surfaces etc. before finish coat is applied. 1.21) Apply two coats of finish color to all exterior/interior surfaces, oil and latex products will be applied to correct surfaces, roof flashing on buildings that has not been painted will remain unpainted. Apply one coat latex epoxy to all surfaces in restroom/shower locker rooms, all other rooms will have two coats acrylic latex applications. 1.22) All colors will have a SEMI-GLOSS finish. 1.23) Designated colors to specific areas of building will be as directed by construction supervisor. 1.24) Contractor will be responsible for the removal/reinstallation as required of all signs, information boards, etc. on buildings. 1.25) As required where new signs will be furnished by owner and installed by contractor, placement to be approved by project manager prior to installment. Contractor is to furnish fasteners to match existing. 1.26) All benches, light poles on project site in colors other than standard will be painted with new colors as directed by construction supervisor, light poles will be painted with a concrete color finish (Sherwin Williams - SW2122). Painting application will apply to all bollards (traffic yellow), painted metal handrails shall be (Sherwin Williams-SW2115), Entry/Park gates as applies (Richards high gloss aluminum enamel # 1011). 1.27) All wood surfaces will be pressured cleaned as per direction of construction supervisor, wood treatment will be applied as per construction supervisor. (clear wood finish w/ ultra violet materials, (with Cedar Tint) not wood sealers/ i.e. Thompson's) 1.28) Contractor shall cover all furniture, fixtures, floors etc. with a canvas/tarp to prevent over-spray. 1.29) All over-spray/excess paint, both new and existing shall be removed from the floors, fixtures, partitions, windows, door hardware etc. (to include paint chips removed during the preparation process, both Interior & Exterior). Before Final Acceptance. All Requests for Information (RFI) must be submitted electronically, in word format, by 01/14/2026 to Roberto.Ciprian@miamidade.gov and a copy filed with the Clerk of the Board at clerkbcc@miamidade.gov Project Location: Multiple Parks South of Tamiami Trail (SW 8th St.)
Bid Results
Playgrounds / Parks / Athletic Fields
$19,094.00
Public - County
Remodeling
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 23, 2026
April 20, 2026
Multiple Locations, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
Bid Date: Jan 23 2026
Miami, FL
--
Miami, FL
Bid Date: Jan 30 2026
Miami, FL
Bid Date: Feb 04 2026
Miami, FL
Bid Date: Jan 30 2026
Miami, FL
Bid Date: Jan 16 2026
Miami, FL
Bid Date: Feb 09 2026
Miami, FL
Bid Date: May 06 2025
Miami, FL
Bid Date: Feb 10 2026
Miami, FL
--
Miami, FL
Bid Date: Feb 04 2026
Miami, FL
Bid Date: Feb 05 2026
Miami, FL
--
Miami, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.