Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 3, 2026 at 7:00 PM
Updated February 4, 2026
Demolition, site work and new construction of a mixed-use development in Cleveland, Ohio. Design plans call for the construction of a theater / auditorium; and 198,000-square-foot educational facility.
Provide Construction Manager at Risk (CMR) services to build a new high school, grades 9-12, with auditorium at the Glennville High School site, including abatement and demolition of the existing building and two other structures on site. The project includes specified technology and LEED v4 requirements. Also, provide CMR services for the abatement and demolition of eight additional buildings in two groups at various locations, coordinating with architect presentations for Landmark Heritage sites as needed. The CMR will be responsible for project financial tracking services and quarterly reconciliation for draw downs for all projects listed. Required services include constructability review of design documents, cost estimating, value engineering, schedule development and maintenance, subcontractor prequalification and bidding, and management of construction and closeout stages. All subcontracts must comply with specified statutory and contractual requirements, and the CMR must participate in the EDGE Program as required. The project is to be managed in accordance with the Ohio School Design Manual and utilize "open book" pricing for subcontracted work reviewed by the Owner, Architect/Engineer, and CMR. Bidders are to demonstrate their ability in financial tracking, draw down reconciliation, in-house estimating, scheduling, and management systems. Submittal instructions require use of Form F110-330, current insurance and bonding evidence, and identification of any EDGE-certified business participation, delivered electronically as a single PDF. All required forms and pertinent details are to be obtained through the OFCC website. As of February 3, 2026, project is in design through December 2026. Construction NTP January 2027-December 2028. CMAR short list identified, selection by end of February 2026.
Design
Educational
$96,164,994.00
Public - City
Demolition, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2026
January 4, 2027
To be determined, Cleveland, OH
Related To This Project
Cleveland, OH
--
Cleveland, OH
--
Cleveland, OH
Bid Date: Mar 02 2026
Cleveland, OH
--
Cleveland, OH
Bid Date: Feb 04 2026
Cleveland, OH
Bid Date: Feb 04 2026
Cleveland, OH
Bid Date: Apr 02 2026
Cleveland, OH
Bid Date: Feb 19 2026
Cleveland, OH
--
Cleveland, OH
Bid Date: Mar 23 2026
Cleveland, OH
--
Cleveland, OH
Bid Date: Dec 12 2025
Cleveland, OH
Bid Date: Jan 09 2026
Cleveland, OH
Bid Date: Dec 29 2025
Cleveland, OH
Bid Date: Dec 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
