BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2026 at 7:00 PM

Updated January 15, 2026

Renovation of an educational facility in Montpelier, Idaho. Working plans call for the renovation of a educational facility.

As of 1/14/2026, all bids were rejected. The project will be rebid. The following work will be performed to the existing elevator and may not be all inclusive. Work must be completed by July 31st, 2026 and may commence as early as January 19th, 2026 (some restrictions will apply if started prior to the end of the school year). All work must meet state, local and industry standards and codes. Contractor must have an Idaho Public Works License and provide proof of liability insurance. Sealed bids must be submitted to Bear Lake School District. Bids will be accepted until 4:00 PM MST Monday, January 12th, 2026. Type: Custom Sized Twin Post Hydraulic Capacity: 2100 Lbs. Speed: 100 FPM Up, 100 FPM Down Hoistway: 7’-4” W x 6’-0” D Minimum Pit Depth: 4’-0” Overhead: 12’-9” Minimum Travel: 24’-9” Stops/Openings: Three (3) Stops, Three (3) Front Openings Machine Room: Adjacent Controls: Non-Proprietary, Smartrise Controller; 208 VAC - Three Phase, 78.2 AMPS, Solid State Starting Operation: Simplex Selective Collective Entrances: 3’-0” W x 7’-0” H, Single Speed, Side Opening, Aluminum Sills Finish: Baked Enamel Doors and Frames at all landings Door Operator: D.C. Door Operators; 3-D Infrared Door Detectors Fixtures: CAR • Main Car Operating Station w/ Standard Floor Push Buttons • Stainless Steel #4 Finishes • Keyed Fan / Light, Run-Stop, Door Open / Close, Alarm Button, Independent Service Switch, ADA Telephone, Car-Riding Lantern HALL • Standard Buttons • Stainless Steel #4 Faceplates Cab: Shell- Applied Laminate Fronts- Stainless Steel #4 Doors- Stainless Steel #4 Ceiling- LED Lighting w/ Lexan Diffusers Handrails- 2” Flat Sills- Aluminum Access- Two Speed Fan, Seismic Zone Provisions, Pit Ladder. Finished floor by others.

Final Planning

Educational

$200,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
18
Bidding Soon
176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2026

March 16, 2026

Project location map

633 Washington St, Montpelier, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.