Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 5, 2026 at 7:00 PM
Updated February 6, 2026
Demolition and site work for a bridge / tunnel in Round Lake Beach, Illinois. Completed plans call for the demolition of a bridge / tunnel.
**As of February 5th, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.* The project includes removing an existing 89 feet of 7.75'x7' double barrel box culvert and replacing the box culvert system with 83 feet of a 9'x8' triple barrel concrete box culverts for flood reduction. Work will include removal and demolition of existing conditions for the box culvert and roadway improvements in this local road carrying Village Drive over the Round Lake Drain. Tasks include removal and replacement of the existing concrete box culvert, headwalls, wingwalls, railings, grading, streambank stabilization, hot mix asphalt, curb and gutter, riprap, storm sewer, and landscape restoration. The work also includes carrying out all duties and obligations and the furnishing of all labor, material, tools, equipment, and other incidentals necessary or convenient for the successful completion of the project. The project is located on North Village Drive on the Round Lake Drain, north of West Main Street and west of North Fairfield Road within the Village of Round Lake Beach in Lake County, Illinois. All questions about the meaning or intent of the bidding documents or any discrepancies or omissions identified therein are to be submitted to the Lake County Stormwater Management Commission in writing Questions must be submitted by the following date: January 13, 2026 @ 12:00 P.M. local time Please email questions to Lake County SMC at stormwater@lakecountyil.gov. Subject line should identify bid# SMC2026003. The Business Enterprise Program (BEP) can consist of minority-owned business enterprises(MBEs), womenowned business enterprises (WBEs), or to minority women-owned business enterprises (WMBEs) in any combination to percentage to 28%
Bid Results
Bridges / Tunnels
$1,249,745.00
Public - County
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2026
February 27, 2026
N Village Dr, Round Lake Beach, IL
Related To This Project
Round Lake Beach, IL
Bid Date: Mar 03 2026
Round Lake Beach, IL
Bid Date: Mar 17 2026
Round Lake Beach, IL
Bid Date: Mar 17 2026
Round Lake Beach, IL
Bid Date: Jul 11 2019
Round Lake Beach, IL
Bid Date: May 07 2026
Round Lake Beach, IL
Bid Date: May 28 2026
Round Lake Beach, IL
Bid Date: Jun 02 2026
Round Lake Beach, IL
Bid Date: Jun 02 2026
Round Lake Beach, IL
Bid Date: Sep 11 2025
Round Lake Beach, IL
Bid Date: Sep 11 2025
Round Lake Beach, IL
Bid Date: Jul 01 2025
Round Lake Beach, IL
Bid Date: Jul 01 2025
Round Lake Beach, IL
Bid Date: Jun 26 2025
Round Lake Beach, IL
Bid Date: Apr 29 2025
Round Lake Beach, IL
Bid Date: Apr 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
