BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2026 at 7:00 PM

Updated February 10, 2026

Renovation of an educational facility in Ventura, California. Completed plans call for the renovation of a educational facility.

Ventura County Office of Education invites sealed bids for roofing replacement at Phoenix School, Douglas Penfield School, and ACE Charter School. Contractors may bid on any or all sites; awards go to the lowest bidder for each school, or one contractor may receive all if they have the lowest bids for each. The project includes the use of Owner-purchased Weatherproofing Technologies, Inc. roofing materials provided through the OMNIA Partners purchasing cooperative. Bidders must possess a valid "C-39" California contractor license and be registered as a public works contractor with the Department of Industrial Relations, with both remaining active and in good standing throughout the contract term. A mandatory pre-bid conference and site visit is required for all participants, with attendance and sign-in mandatory; failure to attend or tardiness will render bids ineligible. Bids must be submitted on the forms provided, accompanied by a bid bond or other approved security equal to ten percent of the total bid price. The successful bidder must furnish a 100% Performance Bond and 100% Payment Bond. All workers must be paid not less than the prevailing wage rates for the locality. Electronic certified payroll records must be furnished weekly. The contract will be awarded, if at all, to the lowest responsive responsible bidder based on the base bid amount. The Office reserves the right to reject any and all bids or waive any irregularity in received bids. No bidder may withdraw its bid for ninety days after the bid opening. All questions about the meaning or intent of the Contract Documents are to be directed via email to the VCOE to maporter@vcoe.org. Interpretations or clarifications considered necessary by the VCOE in response to such questions will be issued in writing by Addenda and made available to all parties recorded by the VCOE as having received the Contract Documents. Questions received later than noon on January 15, 2026 may not be answered. PHOENIX SCHOOL 500 Airport Way, Camarillo, CA 93010 DOUGLAS PENFIELD SCHOOL 640 Jazmin Ave., Ventura, CA 93004 ACE CHARTER SCHOOL 570 Airport Way, Camarillo, CA 93010 Bid Result 2026-02 Phoenix -Best Contracting -247000 026-02 Penfield-Best Contracting -419000 2026-02 ACE-Best Contracting-312200

Award

Educational

$978,200.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2026

July 6, 2026

Project location map

Multiple Locations, Ventura, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.