Published March 2, 2026 at 7:00 PM

Updated March 3, 2026

Site work for a water / sewer project in Waterford, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number 0000407890 Question Deadline 01/16/2026 at 3:00 PM ET A.The Contract, if awarded, will be awarded to the lowest, responsive, and responsible bidder, subject to the final approval by the Oakland County Water Resources Commissioner. The Contract will be awarded subject to receipt of funds to finance the project and acquisition of easements, during which time the proposal guarantees of the lowest three responsive, responsible Bidders will be held. B.The party to whom the Contract is awarded will be required to execute the Agreement and obtain the Performance Bond, Labor and Material Bond and Maintenance and Guarantee Bond and shall provide proofs of insurance coverage in accordance with the Contract Documents within ten (10) calendar days of the delivery date of the Notice of Award to the successful Bidder. The necessary Agreement and Bond forms shall accompany the Notice of Award. If the Contractor awarded the project fails to execute the Agreement, submit Performance Bond, Labor and Material Bond and Maintenance and Guarantee Bond and provide proofs of insurance coverage in accordance with the Contract Documents within ten (10) calendar days of the delivery date of the Notice of Award, the Owner may declare the Contractor in default, in which case the Proposal. Guarantee accompanying the Proposal will be forfeited to the Owner. A certified or cashier's check or bid bond for a sum not less than five percent (5%) of the amount of the proposal will be required with each proposal. Owner reserves the right to accept any proposal, to reject any proposal and to waive irregularities. A. Scope of work for the Elizabeth Lake Pump Station Rehabilitation Project Phase 1B: 1) Replace the existing flanged 30x10-inch tee with a 30-inch tee (furnished by others). 2) Utilize temporary bypass pumping system to bypass the station from the bypass structure with stop logs built adjacent to the station along the 54-inch influent sewer to the 30-inch force main. 3) Connect bypass pumping equipment to building power/standby power. 4) Install temporary cover over bypass structure to limit odors in area while permanent cover is removed. 5) Provide continuous wet well dewatering during project due to leakage through stop log system. Reroute any other flows from wet well to bypass structure. 6) Dewater and clean wet well. 7) Install protective coating on wet well. 8) Replace the bar screen in kind in the wet well. 9) Replace railing and repair items in wet well as show on the Drawings. 10) Remove the MJ x FL wall pipes on the suction piping for five (5) pumps that pass through the 18-inch reinforced concrete wall between the wet well and dry well. Replace pipe and mechanical wall seals. 11) Replace five (5) flared suction elbows in the wet well. 12) Replace the suction piping on the five (5) sewage pumps 13) Install the suction gate valves and hydraulic actuators (furnished by others). Connect the proposed hydraulic actuators to the existing plant process water system. Connect the actuator limit switches to the existing controls system. The project includes sanitary bypass pumping, wetwell cleaning and coating, manual bar screen replacement, piping and valve replacement, concrete coring and repair.

Award

Water / Sewer

$1,331,000.00

Public - County

Site Work

27

15

21

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
4
Bidding Soon
1,701
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2026

February 20, 2026

Project location map

10 Hillcliff Dr, Waterford, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.