BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

Site work and paving for a mixed-use development in Janesville, Wisconsin. Completed plans call for site work for a road / highway; sidewalk / parking lot; water / sewer project; for paving for a road / highway; and sidewalk / parking lot.

For furnishing all the labor, materials, equipment, and doing all work necessary for the construction of a Local Road Improvement Program (LRIP) project on Mt. Zion Avenue from Milton Avenue to Pontiac Drive, including approximately 1,000 LF of 8" water main replacement; 4,700 LF of 12" water main replacement; 50 water service reconnections, replacements, or abandonments; 2,600 LF of storm sewer replacement; 81 utility structure replacements, removals, rehabilitations or installations; 23,100 SF of concrete sidewalk and driveway approach replacement; 18,200 CY of unclassified excavation; 32,100 TONS of aggregate base; 7,630 TONS of asphalt paving, 19,000 LF of epoxy pavement markings; 10,000 SY of grass terrace restoration; and miscellaneous construction items. The determination of the lowest responsible and best bid will be decided by the City Engineer, subject to review by the City Council The Council reserves the right to reject any and all bids. No bid will be considered unless accompanied by a certified check equal to 10 percent of the bid or a bid bond in equal amount, payable to the City as guaranty that if the bid is accepted, the bidder will execute and file the proper contract and performance bond within ten days from the date the lowest responsible bidder's bid is accepted. In case the bidder fails to execute such contract and performance bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages. If applicable, Federal Davis-Bacon wage rates are included in the Contract Documents, as well as on file in the City Clerk's Office. No bidder may withdraw their bid within 45 days after the actual date of the bid opening. The Contractor will furnish all the labor, equipment, materials, and management necessary to complete the following work in accordance with the contract documents: The work on Mt. Zion Avenue will consist of water main replacement, storm sewer replacement, utility structure rehabilitation/replacement, signal replacement, curb & gutter replacement, driveway approach replacement, intermittent sidewalk replacement, pavement reconstruction, pavement markings, terrace restoration, and all incidental items necessary to complete the work

Post-Bid

Roads / Highways

$5,185,000.00

Public - City

Paving, Site Work

180

7

2

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
827
Active Projects
533
Bidding Soon
3,971
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2026

March 30, 2026

Project location map

Mt Zion Ave, Janesville, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.