BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2026 at 7:00 PM

Updated February 6, 2026

Site work for a water / sewer project in Los Angeles, California. Completed plans call for site work for a water / sewer project.

As of February 05, 2026, this project has not yet been awarded. The project is expected to be awarded approximately 2 months after the bid opening date. LIQUIDATED DAMAGES $4,000 per Calendar Day COMPLETION TIME 720 Calendar Days The deadline for receipt of written technical questions is December 31, 2025. At the time of bid the contractor must possess a valid State of California Contractor's License Classification of "A." The successful bidder shall also provide two good and sufficient surety bonds after notification of award. The Payment Bond and Performance Bond shall each be for 100 percent of the contract price The project proposes to capture stormwater runoff from a 445-acre tributary area with an estimated average yield up to 225 AFY by diverting surface flows within the storm drain MTD 117 to the park. Best Management Practices (BMPs) strategically located throughout the undeveloped portion of the park are proposed to capture and store stormwater runoffs. The proposed Project consists of installing a 1.4-acre underground infiltration gallery to capture and infiltrate stormwater at Strathern Park North. Construction of the underground infiltration gallery will include installation of a diversion structure, a catch basin, storm pipes, a hydrodynamic separator, desilting basin, flow measuring devices, and educational signage. The Board of Public Works anticipated level of MBE participation is 4%, WBE participation is 2%, SBE participation is 25%, EBE participation is 8%, and DVBE participation is 3% (See Part III of the Proposal). Requests for clarification of conflicts and omissions from the contract documents shall be addressed in writing to: Eduardo Hernandez Clean Water Division 1149 S Broadway, Suite 630 Los Angeles, CA 90015 E-MAIL: Eduardo.Hernandez@lacity.org The deadline for receipt of written technical questions is December 31, 2025

Bid Results

Water / Sewer

$23,238,900.00

Public - City

Site Work

94

45

18

4

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
634
Active Projects
317
Bidding Soon
3,233
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

February 20, 2026

Project location map

8041 Whitsett Ave, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.