BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2026 at 7:00 PM

Updated January 14, 2026

Site work and paving for a mixed-use development in Wenatchee, Washington. Completed plans call for site work for a sidewalk / parking lot; road / highway; water / sewer project; for paving for a road / highway; and sidewalk / parking lot.

This project will disconnect existing storm drain outfalls from the piped portion of the No. 1 Canyon Drain (NOCD) system located in Pershing Street between Springwater Avenue and Maple Street and improve stormwater controls with a collective of replacement storm drainage systems and roadway infrastructure repairs. Work will include the installation of a combined 2,037 LF of 12-, 18-, and 24-inch corrugated polyethylene pipe (CPEP) connected by 24 pre-cast concrete catch basins of various sizes. The project includes 642 LF of gravel infiltration trenches of differing widths and sizes of perforated CPEP. Four (4) premanufactured water quality filtration catch basins will be installed off-line to treat surface runoff directly prior to release to the new drainage systems. The base project also includes approximately 1,433 LF of 8-inch ductile iron water main replacement is also included in the work for this project. The NOCD within the subject area is a combination of 36-inch diameter CPEP and 48-inch corrugated metal pipe (CMP). An alternative additive project scope of work has been identified and may be included in the final contract to remove and replace two (2) approximately 30 LF damaged portions of 36-inch CPEP and to install a new cured-in-place pipe (CIPP) liner over approximately 1,066 LF of the existing 48-inch CMP portion of the NOCD. Site Directions: Pershing Street between Springwater Avenue and Maple Street. Also includes side streets Woodland Drive, Alderwood Drive and Central Avenue in Wenatchee, WA 98801. The city can be accessed from Highway 2 to the north, Interstate 90 and Highway 97 to the east and south. Est. Value Notes: $2.8 - $3.1 m o This project will be funded in part by the Washington State Department of Ecology. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from this solicitation for bids. o Time for completion of the Work is limited to 100 working days. o The Successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Relate Acts which requires that all laborers and mechanics employed by contractors and subcontractors performing on contracts funded in whole or in part by SRF appropriations in excess of $2000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, and determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. Question Deadline 01/20/2026 at 4:00 PM PT: Questions regarding the Specifications should be addressed in writing to: Darci Ronning City of Wenatchee Public Works Department dronning@wenatcheewa.gov (509) 888-3287 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Water / Sewer

$3,100,000.00

Public - City

Paving, Site Work

41

7

14

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2026

March 30, 2026

Project location map

Pershing St, Wenatchee, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.