BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2026 at 7:00 PM

Updated March 3, 2026

Remodeling of an educational facility in Matteson, Illinois. Completed plans call for the remodel of a educational facility; educational facility; educational facility; and educational facility.

2026 3 - 5 Furniture Design Question Deadline 01/16/2026 Submit all questions regarding the Bidding Documents to the Architect. Replies will be issued to all bidders of record in the form of an Addendum. Questions received less than five days before the bid opening date cannot be answered. Project Number: 25-082 Neil Armstrong Elementary School, 5030 Imperial Drive, Richton Park, Illinois 60471 Woodgate Elementary School, 101 Central Avenue, Matteson, Illinois 60443 Marya Yates Elementary School, 6131 Allemong Drive, Matteson, Illinois 60443 Sieden Prairie Elementary School, 725 Notre Dame Drive, Matteson, Illinois 60443 Definitions. The following terms are used throughout the Contract Documents. The work will be governed in accord with the definitions. 1. Fabricated: Fabricated pertains to items specifically assembled or made of selected materials or components to meet individual design requirements. 2. Manufactured: Manufactured means standard units, usually mass produced by an established manufacturer of the respective item. 3. Provide: Provide means furnish and install. 4. Shop fabricated or shop made: Shop fabricated or shop made refers to items made by a Contractor or Subcontractor in their own Shop. A. The contractor shall be responsible for providing and paying for: 1. Labor, materials and equipment. 2. Tools, construction equipment and machinery. 3. Temporary water, heat and other utilities required for construction. 4. Other facilities and services necessary for proper execution and completion of work. B. The contractor shall be responsible for paying and securing all permits, governmental fees and licenses other than primary building permit necessary for the proper execution and completion of the Project. C. The contractor shall comply with all codes, ordinances, rules, regulations, orders and other legal requirements of the public authorities which govern the performance of the work under the Contract Documents. D. The contactor shall have duty to promptly submit written notice to the Architect of any known or observed variances of the Contract Documents from legal requirements that may govern the work. Upon notice to the Architect, appropriate modifications will be made to the Contract Documents to account for the legal requirements. In the event the contractor fails to provide notice of any variances, he shall assume responsibility for any work known to be contrary to those legal requirements. 1. The contractor shall enforce strict discipline and maintain good order among employees and subcontractors. Contractor shall not employ any unfit person or those not skilled in the assigned task. The contractor acknowledges that the Project is exempt from all State and Local use taxes. It shall be the duty of the contractor to: 1) obtain a sales tax exemption certificate number from the Owner; 2) place exemption certificate number on invoices for materials incorporated in work; 3) furnish copies of invoices to Owner upon request 4) file a notarized statement that all purchases made under exemption certificate were entitled to be exempt with Owner upon completion of work; and 5) pay any penalties assessed for the improper use of exemption certificate number.

Award

Educational

$415,867.00

Public - County

Remodeling

7

7

4

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2026

July 20, 2026

Project location map

Multiple Locations, Matteson, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.