BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2026 at 7:00 PM

Updated February 28, 2026

Renovation of a municipal facility in Monroe, Michigan. Working plans call for the renovation of a municipal facility.

**As of February 26th,2026 bids were canceled. No definite date for the rebid.** Reference Number 0000408341 The Suburban Mobility Authority for Regional Transportation (SMART) is soliciting competitive quotes from qualified vendors for a Waste Oil Heater Replacement for the Lake Erie Transit Commission. The selected contractor shall be responsible for furnishing all labor, materials, equipment, and supervision necessary to carry out the removal and proper disposal of the existing unit, as well as the complete installation of the new equipment in accordance with all applicable codes and standards. Additionally, the contractor shall be responsible for obtaining all required permits, performing system startup and testing to ensure proper functionality. The contractor shall also provide training to designated staff on the operation and basic maintenance of the newly installed system. Please submit all warranty information with your quote. Replacement of waste oil heater for Lake Erie Transit Commission Project Location: Lake Erie Transit Commission 6150 Front Street Monroe, Michigan 48161 Please see the specifications listed below: o Heating area (sq.ft) to 10,000 o Heat range (BTUH) to 300,000 o Power supply (AC) 120v.60 Hz 20 AMPS o Unit Dimensions (H-W-D) 36" (inch) X46" (inch)x48" (inch) to be mounted on top of 8'(foot) high brackets attached to oil tank o Weigh (lbs) 630 o Chimney Location: Top for through the roof Chimney o Compressed Air: 2 CFM-18 PSI o 8" (inch) thru-roof Class A Chimney kit (16'(foot) eave) o .1 Chimney cap o .1 Storm collar o .1 24" (inch) class A chimney pipe o .1 capped cleanout Tee 8" (inch) o .1 8" (inch) barometric damper o .1 roof flashing 0/12-6/12 o .1 36" (inch) Class A chimney pipe o .1 finishing collar o .1 14" (inch) slip connector o .1 24" (inch) black pipe o .1 black tee pipe w/cap o .1 roof support bracket o .1 215-gallon tank (stores 215 gallons of waste oil) The primary and secondary air regulators, fuel line, oil bypass regulator, pump, primary strainer, in-tank check valve and oil strainer shall be installed in full compliance with the manufacturer's installation manual. The installed system must meet or exceed the performance and functional standards of the Lanair XT-300 waste oil heater or approved equal (see Section 2.04). Buyer Preferences, Guidelines & Requirements General Requirements - Federally Funded - Installation Required - Insurance Required - Warranty Information Required Award Requirements - All or None Award Question Deadline 01/20/2026 at 3:00 PM ET Questions are submitted online No

Final Planning

Municipal

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

August 26, 2026

Project location map

6150 E Front St, Monroe, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.