BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Site work and paving for a civil project in Norwalk, Wisconsin. Completed plans call for site work for a water / sewer project; and road / highway.

Work includes installing new watermain, maintaining continuous water service, installation of new valves, providing new water services, and abandoning existing mains. The existing water service shall be replaced for the full length with a minimum size of 1" (Type K copper) and reconnected to the new main. Use approved reducer fitting at Curb Stop/Box for connections to existing smaller diameter service pipe. The quantities are based on replacing the entire water service from the main to the property line. Continuous water service must be maintained. Coordinate existing service and new service locations with Village utility staff. Removal and replacement of unsatisfactory subgrade material encountered within the pipe foundation, bedding, haunching, and initial backfill is included in pipe cost. Unsatisfactory subgrade below the pipe bedding is paid by the Unsatisfactory Subgrade bid item under Water. Unsatisfactory subgrade outside the pipe zone is paid by the Unsatisfactory Subgrade bid item under Streets. One density test for every 200 lineal feet of trench per two-foot depth of fill will be required. The Engineer will determine locations and depths for the tests. Excavate and backfill the holes at no additional cost to the Owner. Repair of failed tests are incidental to sewer installation. All costs for density testing of trench backfill and all costs for dewatering are incidental. The Wisconsin D.O.T. Standard Specifications, current edition (and supplements thereto), shall be the basis for roadway construction except as modified herein. Geotextile and other specific materials listed in the specifications are to be used as outlined. MBE (0.6%), WBE (6.9%) Substantial Completion November 30, 2026 Ready for Final Payment in accordance with Paragraph 15.06 of the General Conditions December 31, 2026 800 lin. ft. 8" PVC Sanitary Sewer 5,550 sq. yds. Pulverized Pavement 3 ea. Sanitary Manholes 3,300 tons Aggregate Base 1,230 lin. ft. 6" PVC Watermain 1,100 tons HMA Pavement 155 lin. ft. 8" PVC Watermain 2,470 lin. ft. Curb & Gutter 750 lin. ft. 36" RCP Storm Sewer 420 sq. yds. 4" PCC Sidewalk Question Deadline 02/03/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information: Davy Engineering Co., 115 6 th St. S., La Crosse, Wisconsin 54601. Telephone: (608) 782-3130. Questions received less than seven days prior to the date for opening of Bids may not be answered

Award

Roads / Highways

$955,164.00

Public - City

Paving, Site Work

24

14

10

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
3
Bidding Soon
584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

April 13, 2026

Project location map

Church St & North St, Norwalk, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.